My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/8/1981 CONSERVATION COMMISSION Minutes
>
4/8/1981 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 5:21:01 PM
Creation date
1/30/2018 1:14:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/08/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• �,3- <br /> Do : Asks what sort of an easement Is that shown on the Plan? <br /> Ken: Asks if it is New Seabury's conservation easement? <br /> Mr. Holmes t e' didn't investigate it any further, but I think it is electric <br /> l ights. <br /> u .ines It is a gas line easement. They used to have gas lights out there, but <br /> this has eroded -.way so Bauch that the gas limes were showing. <br /> Dorothy. is there any bulkhead there? <br /> Mr. Holmes: Not on that particular lot. <br /> Pauline: Down further. <br /> Ken: is that gas line till there now? <br /> Pauline: Some of it is and -some of it isn't. <br /> -Ken: Where Is no gas there now. <br /> Paulinet No. It has been disconnected. <br /> enj When there isn't a chance that somebody would break a gas line. <br /> Pauline: No. <br /> Mr. Holmes t I gust assured that those were electric lights and that was an elec- <br /> tric easemento <br /> There is one problem with the septic system which has been cleared with the Health <br /> Department. Some of this ground is filled ground and art least the area where the <br /> septic system is going is Filled ground. when that happens, we are supposed to <br /> Put coarse;.sand and gravel for a distance of 25 feet outside the leaching facility, <br /> And because this ig in the front yard, we can't do that on the Portion that i <br /> closest to the road. So, the Health Department said that they would grant a waiver <br /> on that. <br /> Dorothy, is there a reserve-area- o some sort? <br /> Mr. Holmes No. It is a State requirement and part of Title v and I don`t know <br /> ghat the recon is because It is not considered part ofthe septic system. The <br /> part that is shown here is -the only part that is used in the calculations. In <br /> this particular case, when we went to the Health Department, Mrs. Anderson said <br /> that she would like to see the reserve area built at this time rather than wait <br /> until some time in the future when it might fail. So that will be part of this <br /> project, He will have a system that is twice as big . s is necessary. <br /> Dor t� a The edge of the horse is only 24 feet from the top of the bank. I <br /> there any way that you could move that house back so that the decks would clear <br /> the easement that goes along the water? <br /> At this point, theFinley's arrive. <br /> Mr. Holmes: Tells theFinley's that the Board was just asking if the house could <br /> e moved back, This was specified by the architect -- the location of the house.- . <br /> From any point of view, it could be -Moved back towards they=street, I assume from - <br /> the architect's point of view, he assumed that it was quite important to have it <br /> where it is. <br />
The URL can be used to link to this page
Your browser does not support the video tag.