Laserfiche WebLink
rdx� conditions <br /> cont. <br /> , <br /> 13. Active shellfish beds are in the vic in-ity. Therefore, the following good <br /> preservatives are forbidden: creosote, creosote/coal tar, creosote de ivi. <br /> tives, Cuprinolt pentachlorouhenol or ehro ated copper arsenate. Tolman <br /> salt or OsMose K-33, or equivalent, are permitted on wood above Mean High i <br /> if applied and -rid <br /> Water, before construction of pier systems. she use of <br /> galvanized steel piles, Cedax or lucu t piles or other untreated good piles <br /> is encouraged. <br /> 1 . Any shellfish disturbed by the driving -of the pilings must be replanted at <br /> applicant's expense. <br /> . Any disturbances of natural vegetation must b replanted. <br /> SE41181, William P. & Evelyn J. Kiley, Lot 272 Taff rail Way, Mashpee <br /> 11. The work shall conform to the following described plans and additional. con- <br /> ditions: <br /> on- <br /> d .t ons: Plan to Accompany Petition of William P. & Evelyn Kiley to Build <br /> and Maintain a Dock, Ramp and Float on 111oponesset Creek, Mashpee, Ma. <br /> Dated: June 1 , 1981, Plans Drawn By: Doyle Assoc. , Falmouth, Ma. <br /> 1 , 13, 14, & 15 (See SE4 -179) <br /> -182, Paula J. Hallett, Lot 30 Waterline Drive North, Mashpee, Ma. <br /> 1. The work shall conform to the follow-ling d.eseri ed plans and additional con- <br /> ditions: <br /> on- <br /> ditions: Plan to Accompany Petition o Paula J. Hallett to Build 'a Maintain <br /> Dock and Ramp on Jehu Fond, Mashpee, Ma. Dated: June 1 , 1981 Plans <br /> Drawn By: Doyle Associates, <br /> 1 . Dock and Ramp shall' be con tructed not greater than 55 feet from mean high <br /> grater. <br /> 3t 1 , 1 , 1 (Same as #12, 13, 1 , 15 on SE43-179) <br /> 1 , Robert W. Gretchen Ann 13arvin, Lot3 de Faun, Mashpee <br /> 11. The work shall, conform to the following described plans and additional con- <br /> ditions Plan to Accompany Petition of Rob't. Gretchen Darvin to Build <br /> and Maintain a. Dock Ramp on ehu Pond, 2 ashpee, Ma. Plans Dated: June 1, <br /> I 81, Drawn By; Doyle Assoc. , Falmouth, Ma. <br /> 12v 131 141 1 (See @tO- ) <br /> S� 184, Robert. S. Flynn, Lot 2 1 Taffrall Way, Mash-Pee <br /> It. The work shall conform to the following described plans and additional con- <br /> ditions: <br /> on- <br /> d t oris: Plan to Accompany etition of Robert 5. Flynn to Build & Maintain <br /> a Dock, Ramp & Float on Ponconesset Creek, : ashpee, Ma. , Dated: Jura 1p 1981, <br /> Plans D-1-ami Doyle Associates, Falmouth, Ma. <br /> 1t 13v 14, 1 (See6E43-179) <br />