Laserfiche WebLink
317-r41-187, Discussion of Lot ]3 Dnriiels l l# ,� iioad, tont. <br /> The fo?low!n� were concerns for denial: Prevention of Pollution, Protection of <br /> Fisheries, Flcod Control, The reasons beim that it does not conform with 'title <br /> of the State E- v;ronmental Code; the distance of the leachate and septic system <br /> from mean high water; it is detrimental to salt marsh; it is subJect to erosion; <br /> the building and Board of Health permits were not applied d for, nb record of a <br /> variance being approved. <br /> S3-1 ado <br /> Bruce Ful ton, Lot 'gaff it Wayl Mashpee <br /> Bruce Fulton came before the Board to present them with a. plan on the pilings of <br /> the house which he propose to build. Explains to -the Board that he did a poor <br /> job of trying to explain the plan when he first t presented it at the hearing. Tells <br /> the Board that the area is all flat. The Board has a concern about a berm washing- <br /> down <br /> ashingdown into the water. Tells the Board that the type of vegetation there is; like the <br /> inch you see in a field, <br /> Pauline: Mentions thpt DQE when issuing a. number for this lot, checked off the <br /> section that the plans for the sewage disposal system Bio (may) not meet the re- <br /> quirements of Title V of the State Environmental Code. Advises Bruce to review <br /> with the Board of Health, <br /> Bruce: Mentions Lot ; and 27t were approved and they have the exact sane condi.-- <br /> tions as this. <br /> gray ne: `Fells Bruce that he will have to get it straightened out through the Board <br /> of Health. <br /> Pauline: Fells Bruce that the Commission must comply with the lair. Asks Bruce if <br /> he has been before the architectural review board's <br /> Bruce: States that he has and that they have approved everything. <br /> { <br /> E4 -1 6 <br /> George Man alos, Lot o Crosstree W <br /> OTE: Hearing ng had been continued because of insufficient information. The follow- <br /> ing Order of Conditions was written up: <br /> It. The work shall conform to the plans on file with the Conservation Commission. <br /> 12. After construction, the area rust be planted immediately and evidence must be <br /> shown that the vegetation is up, <br /> . Permits will have to be appliewd for with different departments for the proposed <br /> wind energy structure. A new Notice of Intent must be filed for on any addi- <br /> tional structures i th in NO feet of Popon es et Creek. <br /> 14. The septic sistem shall be in accordance with Title V of the State Environmen- <br /> tal de and the ?lashpee 0a.rd 0f HEIa 11111 ru1e s and 17e 1131 ations., <br />