My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/28/1982 CONSERVATION COMMISSION Minutes
>
4/28/1982 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 5:19:34 PM
Creation date
1/30/2018 2:26:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/28/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cnnser a.t on Commission <br /> Mnutes of April 28, 1082 Page <br /> Flynn Hearin! cont. <br /> Wa,tyne -Suggested that they contact their attorney and get some advice From him, <br /> Mrs. Flynn: Asked if she would have to apply over azain if she did f ind OUt .she <br /> owned the land? <br /> Pauline: We can issue a continuance. However, DEQE has issued a. number and we <br /> have to legally reply within twenty-one days, <br /> Dorothy: Told the Flynn's to let the Commission know within the twenty-one day <br /> period as to whether they owned the land or not so that the Commission could a.'ct. <br /> She also stated that there was no point in continuing it or postponing it as it <br /> has to be resolved. <br /> . i <br /> oo P.M. Nearing S 3-229 i <br /> George Harrington, Lot 64 Waterway, Mashpee <br /> This h. a,r•ing is a, continuance From April 7 as the applicant failed to appear, <br /> Mr. Harrington waspresent for the following hearing: <br /> Pauline: Head the public hearing notice to construct a dock and ramp at Lot 64 � <br /> Waterway along the bank of a. sheltered waterway, Popponesset Channel in accordance i <br /> with plans -on elle with the Commission. Notification was received from D Q --- <br /> Chapter 91 permit ma.,y be required by the Division of Waterways and Coastal Wetlands <br /> Regulations numbers 25 and 32 should be r'e -ie ed. <br /> Mr. Harrington: Explained to the Commission that the area was. located in .the-.Bri hts <br /> Cove area. He ta.td that h had notified both abutters and spoke with theme. <br /> td a ne: Asked if the house was there currently? <br /> Ir. Harri Replied that it was under construction, <br /> Charlie: Remarked that it was through a, narrow channel. Asked if there would be <br /> any bulkhea.ding? <br /> Mr. Harrington: Replied that there wouldn't be any bulkhea.din,g or any piles -rt- ,jus;-t-, <br /> Pipes <br /> Wayne: Asked how wide the channel was at that point? <br /> Mr. Harrin Repliedthat it was about 40 feet gide. <br /> Charlie: Asked if it would extend out more than any of the other piers in the area. <br /> Mr. Ha.rri t replied "no" and that, it would be similar to the other piers. <br /> a. ne; Asked if it was deep enough for his boat? <br /> Mr. Harrin on:_ ReDlied that it was in that location. <br /> Pauline: Informed Mr. Harrington that the Commission requires spacing between the <br /> boards t <br /> ir~� <br /> Harrington: Sta.ted that he had indicated that on his plan.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.