My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/28/1983 CONSERVATION COMMISSION Minutes
>
9/28/1983 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 5:30:45 PM
Creation date
1/30/2018 3:45:22 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/28/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_)M , -Conservation- Commission' <br /> - -Minutes of ep eml er- 28# . 198-3 ' - Page <br /> Gerald- Kiplari Hearing., cont. <br /> Wayne Tavares explained that they- outlined an area of sand and created <br /> beach at the lower-- level and contained the 'entire area with. railroad -ties <br /> with steps going do n. ll- .this was done under a previous filing Wayne <br /> said that. they plan o. take ,rilroa ties out'. MOV6 them back 10 feet, re, <br /> i1hnstal. hem, remove the ;veg , tion and -put in sand. He also. said that <br /> there, would e .a , apnes - garden which would be within loo feet of wet <br /> lands He said that+ there would .be 'no - egetation to be removed in the <br /> garden-' area + <br /> Charlie commented that when the water came .up high during the Spring.* the <br /> area was,. a swimming. pool and that he wondered about extending-'the work <br /> back., Wayne said that they did not plan- to work on that area at all- re. <br /> fern d to by "Charlie. <br /> No further questions were asked by the Board. The following Order of <br /> condition's., were issued: the work shall conform to plans submitted to <br /> the i Iashpee; Conse' rva' tion Commission, <br /> -3 o. f - <br /> on in ance of Bertram Finley. �-�- :00 p•r . + <br /> Lot- 241. waterway _ _ <br /> Due to a lack-,of a quorum at the Commissibn' s meeting of . September 14, <br /> continuance was held tonight on . the request- of Mr. Finley t 'construct <br /> and maintain a' sin le- amily dwelling including septic, sys+tem, utilities - <br /> and landscaping within. 100 feet, of. Spinnaker Core. <br /> r-0, Holmes, of Holmes. and .McGrath Engineering, and Mr.. 1 s. FinleY, were <br /> present during the hearing... <br /> Holmes- presented' a. list,'-of ..abutters: which were notified of the hear- <br /> ing:,'as- e-11 as thentin t n -.. . <br /> Mr. -Holmes explained- that- the plan came before the 'Commiss ion - in '1981- in <br /> which-an Order- of Condition were issued. He said that the house would <br /> be identi- ai,- however, there would be a couple of charges to the- septic <br /> system which was requested' by the Health dept, <br /> Pauline ,asked if the house was completed or Started? <br /> Mr. Holmes replied-," that , the house' eras nearer started& He said that all the <br /> permits had expired. He said that a note has been added to the plan about <br /> spoils which which must g - t the town disposal area and a note about hay bales <br /> has been added to- protect.- the waterway -and a valve between the septic sys- { <br /> tern ,has been added <br /> Mr. Holmes told the Commission that when the Order Of Conditions was is- <br /> 1 sued .two gears ago, the conditions were: no heavy equipment on the Jwater� <br /> s-Lde of -the house a flowed,' al1.' excavated materiae shah.y be removed from. <br /> the- sites - no- fill to be placed between 'the water -body and the water side <br /> of the dwelling, no di s turba ce' of the bank on Spinnaker Cove, and the <br /> septic s rst m shall be- in conformance. with `title V. <br /> Charlie -comme t d that it was <br />
The URL can be used to link to this page
Your browser does not support the video tag.