Laserfiche WebLink
n <br /> r, <br /> f <br /> i y <br /> Blashpe e Conservation Commission Page s i <br /> Me eta".ng of August9,, 1984 <br /> r ile coastal bank already encountering erosion problems because <br /> of inefficient measures used in construction of other dwellings and <br /> ars access road constructed without a valid order of conditions on <br /> which a Cease & Desist Order exists) in the immediate area. The <br /> plans submitted for this project do not contaro any means for con- <br /> trolling flooding over the bad nor do they address the problem o <br /> adverse effects on the stability of the coastal bank in vier of the <br /> size of the proposed duelling which is considerable . <br /> The Conservation Commission will request the ovmer of this property <br /> to seek an Environmental Iwoa.ct Report on this project and also that <br /> reconsideration be race as to the size and scope of the proposed <br /> dwelling, <br /> No coastal engineering structure such as a bulkhead, revetm nt or <br /> seawall shall be permitted on this coastal bad at any time in the <br /> fixture to protect any project using this site . <br /> Paul N, Piccirillo - Lot #104 <br /> Order of Conditions <br /> This app:l ication is to coni trust a house , drive*'ia� , re iaaini� g -,%a, <br /> and septic system within 1001 of a. rvie tlan , Oclo.%Pa y B ay. <br /> It is no ted thF.� ���� � � �..1r� . chu1t� , abutters of the groper t <br /> :,geared a s� e re:�'ar i► th e s ire j o e arl in this :m e tin . <br /> A:"ter h i s ��s i o��, i. �����a s �to , te e t o l e s a i c a i s 'o r i , <br /> following reasons : l Suitable alternatives to the proposed re- <br /> taining wall have not . been explored; 2 ] e-vegation material has <br /> not been stipulatedr 3 The apparent engineering error iregard <br /> to contours of 23.5' in the front of the house and III in the back <br /> of the house flood control must be corrected; Drainage patterns <br /> have not been established. <br /> . ` . Hagge tt �- Lot dreg Road <br /> decision on the Order of Conditions to be issued for this project <br /> has been postponed until. Augut 16, 1984, due to a lack of a DEQ. <br /> filing no . <br />