My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/27/1984 CONSERVATION COMMISSION Minutes
>
12/27/1984 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:06:53 PM
Creation date
2/16/2018 2:09:46 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/27/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ians <br /> Title Dated Signed and Stamped y on File with: <br /> Proposed Sewage <br /> systemat on 6-01-84 All Cape survey Consult. DBQE <br /> Lot 104, surffnr- <br /> sea Road <br /> Cross Section ._ . '�. .�rf <br /> Lot 104o, Sunmer- 10-11-84 All Cape survey Consult. DIEQE <br /> • <br /> sea Pzad <br /> Special Conditions(use additional paper if necessary) `'' •� ��` <br /> r <br /> _ . Prior to ccmencement of construction, a raw hay "bales must be.staked <br /> end- -encs alone the -foot contour line, Hay ]des must be maintained <br /> and replaced, when necessary, until all disturbed areas are revegetated, <br /> . This raw of hay bales shall also serge to delineate the 1 m* ut of work area. <br /> No heavy construction equipment, vehicles or fill are allowed seaward of the <br /> li-rr't of work area. <br /> 3. The placement of fill is strictly l=ted to that area shorn on the above- <br /> referenced plan. _ <br /> . All roof runoff rust be channelled into downspouts and directed into dry well S. <br /> i . All areas disturbed during construction must be stabilised mediately agatemt <br /> erosion and r+evegetate , with appropriate erosion control plant species and/or <br /> local ,indigenous plant species, within 30 days of final on-site grading.. <br /> 6 <br /> The area seaward of the 1=t f work area (6-foot <br /> contour) must a nkdMtained <br /> as a buffer of natural. vegetation. The clearing of dead brush, trees and tree <br /> limbs and selective vista pruning s pe mssible, clear cutting seaward of the <br /> l�rt of work area is prohibited. _ . :. ..: <br /> . The project engineer aund contractors must be advised of the conditions of <br /> ,this order. The applicant is responsible for c pHance of hese conditions. <br /> ■..►. ..r.•r•+rtrrt.*r..... ..f}.+rt.....i.rtrt rr•rr+r.rtr■•.rrt .rti.r.rt#.+•rra rr.+rtrt.rtrt+rrt.rfrt....►..rtrtr.rr.•.. rti..■. rrtr#ia■isr.•rt.rrrrt.....r....rtrt.rtrstrtrtr..t.....•*.•■■•;•risr■..ri. # <br /> (Leave Space lwk) <br /> '3 '' <br />
The URL can be used to link to this page
Your browser does not support the video tag.