My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/27/1984 CONSERVATION COMMISSION Minutes
>
12/27/1984 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:06:53 PM
Creation date
2/16/2018 2:09:46 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/27/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
q <br /> r ' <br /> ons: <br /> Title Dated Signed and Stamped by: On File with: <br /> Proposed Sewage <br /> §ystEm L<>cation 6-01-84 All cape Su.rve r Consult. <br /> DBQE <br /> Lot 104, Summer- <br /> sea <br /> um - _ �. - <br /> sea Road <br /> Cross Section •.. ,*. <br /> Lot 104, S - 10-11-84 All cape Survey Consult. DEQ <br /> sea Rcadi <br /> r <br /> + <br /> Special conditions(use additional paper if necessary) <br /> 1. Prior to ocmuencement of construction, a row of hay bales must be-staked <br /> end-to-end along the -foot contour line,, Hay bales must be naintained <br /> and replaced, when necessary, until all disturbed areas are revegetated* <br /> 2. This row of hay bales shall also serge to delineate the lam"t of work area, <br /> No heavy construction ecjuipment, vehicles or fill are allowed seaward of the <br /> r=a*t of work area., <br /> 3. The placement of fill is strictly I invited to that area shown on the above- <br /> referenced plan. <br /> . All roof runoff must be chamelled .into downspouts and directed into c#y weds. <br /> . All areas disturbed during construction rust be stabilized mediately against <br /> erosion and revegetated, with appropriate erosion control plant species and/or <br /> local indigenous plant series, within 30 days of final on-site grading. <br /> a <br /> . The area seaward of the la mit of work area -foot rpt must be maintained <br /> as a buffer of natural vegetation. The clearing brush,ush, gees and tree <br /> limbs and selective vista p g s permissible. Clear cutting seaward of the <br /> 1=t of work area as prohibited. .:. <br /> 7. The pro3ect engiLneer arm contractors must be advised of the conditions of <br /> this order. The applicant is responsible for c npiiance of these conditions, <br /> r <br /> s.tirrt.r.....r+t......+.irtti...+....rr.r+..•r rrrt r+.ar..r..a.rrara+ffaat#.#+..+.+. .•r.ratrtra.r+.frrt.r..+rtaa.......... .■a.ar.rrrtrt........... <br /> rt+ar..aar.t.+.r+f..iiia•fasar.i..+■t..ai; <br /> (Leave Space Blank) .. ,:,... <br /> 5-313 y <br />
The URL can be used to link to this page
Your browser does not support the video tag.