Laserfiche WebLink
■ <br /> Mashpee Conservation omm i i on <br /> Meeting of June 6, 1985 <br /> Page Two <br /> nothing 's to infringe past this point . <br /> 3 . The earlier dock permit issued under the name of <br /> Robert S . Douglas shall be changed to reflect the current <br /> owner. <br /> . No coastal engineered structure such as a bulkhead, <br /> revetment, or seawall shall be permitted on an eroding <br /> bank at any time in the future to protect the project <br /> as allowed by this Order of Conditions . <br /> Shellback WaY .Realty Trust (BSC Cape Cod Survey Consultants -- Agent) <br /> This application is to construct two office-tyke buildings with <br /> parking, circulation, drainage , utilities ; site preparation in- <br /> cluding removal of vegetation, filling, grading, replacement o <br /> non-functioning ditch with culvert, replication of 2440 sq. feet <br /> of bog area at Noisy Hole Road on Route 2 . - <br /> Arlene Wilson, representative of the agent, presented plans and <br /> submitted aerial photographs of the area. <br /> The Presentation of significant ata was quite lengthy. Proposed <br /> work will include grading and leveling on the upper section w*'I <br /> -th a <br /> i <br /> � p-ra.p slope so that the vegetated surface upon completion will all <br /> be unif-orm at elevation thirty-five , <br /> Ms . it on stated that the entire project will have to go to site-plan <br /> review and the Board of Appeals . she said that the site is quite <br /> constrained in teras of where a structure can be located, <br /> Ms . Wilson stated , "The septic system has been designed to be as far <br /> away- from the wetland system as possible and also as far away from the <br /> proposed well as possible . We have shown this area with a 150'dia- <br /> meter radius around the on-site we l i . Although there is construction <br /> that will occur within that radius , all of the drainage systems that <br /> are within that area are closed. There are closed man-holes piped <br /> outsi <br />