Laserfiche WebLink
MASHPEE CONSERVATION COMM I SS 1 ofd f <br /> MEETING OF JANUARY 8, 1987 <br /> COMMISSIONERS PRESENT: Gertrude Ferriday, Acting Chairman ; Carol Jacobson; <br /> March duPont; glary arsters ; Elliot Rosenberg . <br /> ABSENT: V. Louise Behrman <br /> The Meeting was called to order at 7:30 p.m. <br /> : o - Colonial Gas Co. , Coastal Engineering-Agent. To install a gas main <br /> along the north std of Quinaquisset Avenue from Riverview Avenue to the Barn- <br /> stable <br /> arn- <br /> stable town line within the town road lay out in the buffer zone. Elaine McKay <br /> f Coastal Engineering and Bob bowling of Colonial Gas presenting . The work <br /> 111 include trenching 30 in h s down from grade. Excavated material wl11 be <br /> stored on the road and excavated areas will be backfilled the same day. The <br /> area i 1 1 be l named and seeded upon completion. the only area to deviate _ i ll <br /> be the bridge and a section at the town line where they will have to locate <br /> the gas line within the pavement over a piling that i s located within the <br /> bridge. Pictures were shown to the commission to i 1 lutrate. The wetland <br /> is south of the read and they are proposing to Rut the main on the north side <br /> of the road . They foresee no siltation . The main will be located i n the center <br /> of the bridge. <br /> Mr . Cove1 i ng stated the drawing i s per state request 1vih'ch shows the gas main <br /> 1 oea ted over the p i I i ng . Mbs t of the v.-ork i n the pavement w i 1 1 be done fr r, <br /> the Barnstable side because of the �.%+ay the read is laid out plus the new paying <br /> on the Mashoee side. He advised the end of the existing main is in Bar-nstob�e. <br /> They wili be runring from Barnstable and will not be g i rig nas t Riverview <br /> John Varl or,da advised the Order of Conditions is a legal docurrient and must be <br /> adhered to. The order for a previous project on Great Neck Road stipulated <br /> the Conservation Officer was to be contacted to determine the location of the <br /> wetland and t ,be notified when work was completed . Ms McKay stated they had <br /> just beer. not i f x ed of copl et ion and it is punned to request a Certificate <br /> of Comp] u n e. <br /> It was noted the person to be contacted concerning the project is Mr. Dowl i ng <br /> at 394-9851 , extension 296. <br /> HEARING CLOSED -- ORCER OF CONC I T I o S WITHIN 21 DAYS . <br /> 7-645 - Hich Wood Water (Dufresne-Henry-Agent) . To instal 1 a 16 inch water main <br /> on the sou th s hou I de r of Rou to 151 f rom the F 1 re Po l i ce acces s road. Jack Larson <br /> and J. . Lawrence presenting . Mr. Larson stated they have completed both sides of <br /> the Quashnet River and have the hook-up link that does cross the river. Hay bales <br /> are proposed on the bank. They will be trenching approximately 5 feet off the <br /> pavement crossing the river. <br /> Mrs . Ferriday questioned the reege to t i on plans . r . Larson stated Erni e <br /> V i rg i l i o is concerned with the edge of the road shoulder being stable enough <br /> to accomodate brea down traffic . hie suggested a hardener be put on the top <br /> with a two arch 1 and co pactad d v�n. He stated High wood i willing to <br />