My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/17/1987 CONSERVATION COMMISSION Minutes
>
9/17/1987 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:01:02 PM
Creation date
2/16/2018 3:06:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOWN OF MASHPEE <br /> CONSERVATION COMMISSION <br /> P.o. BOX 208 <br /> MASHPEE, MASSACHUSETTS 02649 <br /> 9111/87 <br /> Memo <br /> To: Conservation Commission <br /> From: John a rk on <br /> Re: Comments on hearings for 9117187 meeting. <br /> There are .a few comments that I would like make on the <br /> hearings for 9117187. <br /> Porcielio:- I have meet with John Sla inksi 'on site at this project. <br /> His client wants to build the stairway in the area of the blowout. <br /> This can be done, however I would -suggest that the blowout be back <br /> filled with loam, and a vegetative cover be planted and maintained <br /> for a period of two years. <br /> Harold Cohen: This prof ct is located on a low lot net to an old <br /> cranberry bog. care should be take with respect to the amount of <br /> fill that will have to use during construction. Also a large buffer <br /> should be left between the house and the wetland. <br /> Peters Hartel Corp, . The proposed replication of the wetlands <br /> should be monitered by a professional biologist with semiannual <br /> reports to the Commission as to its progress. The line of hay <br /> bales should be moved to the edge of clearing, not at the edge <br /> of the wetlands. The dredging of Argos Pond could be allowed if <br /> specific access points are proposed, with mitigating measures for <br /> the loading and unloading of the dragline are conditioned. A res- <br /> toration p In for the access areas should also be conditioned. <br /> andburg: This RDA states that the project is over 451 from the <br /> edge of the Pond, and on the opposite side of the house, Using <br /> the house as a buffer for the pond, I recommend a negative det. <br /> Anastasia: This RDA states the proposed addition and deck are <br /> ' from the edge of the pond. As long as a work limit and erosion <br /> screen is used, I recommend a negative det. <br /> Egan: This RDA states that an existing deck is to be removed and <br /> a new one of s i l ght l y larger size. 1 recommend a negative det. <br />
The URL can be used to link to this page
Your browser does not support the video tag.