i <br /> S <br /> '4 <br /> Conservation commission <br /> Meeting of October 1 ? 1987 <br /> Page 3 { <br /> Mr, Burns stated this could create a trap and should be looked into. <br /> d ori ed the structural eng sneer had coked into this. <br /> Nis anghauser - <br /> Mrs, Ferriday stated this is something the Commission would conditions <br /> She asked if the cartways to be bituminous are marked and was told the <br /> areas for the safety of the structure that need to be bituminous are � <br /> • d because the are coming down <br /> where the g� • d� ng tarts to -go back a - <br /> a slope it would be helpful -if this is too, f t s stated only <br /> � <br /> the cartwa s shown on the plan were - t be bituminoust that is all <br /> you would get. Mrs. Ferriday stated the Commission would meed dis- <br /> tances. <br /> Ms Langhauser. stated they are remaking a grade change of 22 feet, 2 <br /> up to 48, If the Commission dislikes discharge pipes within 7 feet <br /> of thew <br /> etland she would check t see they could put ire leaching <br /> � <br /> catch basins. <br /> `d questioned the amount f discharge and th <br /> Mrs, Ferriday � e timetable <br /> between moving f the road back and forth and construction* Ms <br /> anghauser stated construction crews are already hired,, The heav'Y <br /> machinery workers ale not the same as those who do- the landscaping <br /> and could landscape as soon as finished if' so conditioned?while <br /> working on phase two they can be landscaping phase one, <br /> COMMENTS FROM THE PUBLIC <br /> Daryl Ch Aman: He questioned the four corners and was advised the <br /> four corners of the culvert are marked as are the ends of the head- <br /> wall and the discharge points * There are splash guards also t <br /> slow down 'Immediately any waters coming out of the piping. <br /> . Chapman questioned any effect on the bog by the stream running <br /> through and was advised any sediment should settle into the splash <br /> guards,. He asked how far they were extending the road chance during <br /> construction and was told they are not going any further than existing <br /> culvert and about to the top of the hill. <br /> There were no further questions or comxents. Ms Langhauser requested <br /> the hearing be continued to the next available hearing date. I f after <br /> the on-site there are no additional questions p she will forward a letter <br /> asking the hearing be closed. <br /> HEARING CONTINUED TO OCTOBER 29, 1987 at 9 :00 p.m. , PENDING THE ON-SITE* <br /> 8: 15 Daniel C. Hostetter ESC Croup SE - 9 o To construct and <br /> maintain 811+. linear ft,, of sewer pipe and 471 + linear feet of water <br /> nd 7 linear fFet of water pipe alongi e along. in qu s et Road a <br /> Bryant# s Cove Road/Cartway all within feet bordering vegetated <br /> wetland at Willow Bend , aka Fox tin, Andrea Da ng a�userpresenting <br /> correction was noted: the rater is 8 feet �lon uinaquis et d. <br /> and 471 feet on Bryant' s Cove Rd. <br /> They are requesting that at the same time they build the pedestrian <br /> culvert, they place a water main on the north side of Quinaquisset .. <br /> and a sewer line� 10 inch FVC on the south side of. Quinaquisset Rd. <br /> The section along the pedestrian culvert is the only one that needs <br /> to be placed at the same tie, the rest can be dons later. <br />