My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/3/1987 CONSERVATION COMMISSION Minutes
>
12/3/1987 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:07:37 PM
Creation date
2/16/2018 3:08:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/03/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission i <br /> December 3, 1987 <br /> Page 8. <br /> During inspection for a Certificate of Compliance on the Houses Lasa <br /> noted the driveway is paved* not permeable , no drywells on the water <br /> side and the deck is half finished. Ernie Virgilio told Mr. Caplan to <br /> put in a paved driveway as the town requires a driveway apron onto <br /> town road. Mr. Kaplan stopped work on the deck. He has agreed to put <br /> in drywells and take out the driveway to the apron point if necessary. <br /> Lisa pointed out one option t.0 put in a drywell far runoff and leave <br /> the paved driveway. <br /> ENFORCEMENT ORDER: The driveway except for the apron area pis to be <br /> removed. <br /> 2. No further' activity is to proceed on the deck until a certificate <br /> of compliance is issued on the house. A hearing must be held for the <br /> deck. <br /> .. Drywells are to be- installed as per plan. <br /> Referring to the hearing on the house, it was stated when <br /> cert i fl ea .{e . f cwwpliance is issued, t the save time a negative <br /> determin io would 'be issued on the deck. <br /> EMERGENCY ORDER OF CONDITIONS: Town of Mashpee, Water Main <br /> Construction, issued. Conditions added:. <br /> Conservation Agent should be notified- no less than three days in <br /> advance of th-e date and time construction commences. The agent ha-1 <br /> inspect and approve all siltation control measures prior to the <br /> breaking of the pavement. <br /> CARTAL 'DEVELOPMENT CORP. : Superceding Order from DEQE was read . As the <br /> changes are so drastic, they -should be required to file a landscaping <br /> plan . A letter to be sent to Holmes & McGrath requesting they come in <br /> for a hearing. The retaining wall is new. Mrs. Ferriday stated t- e <br /> work limit should be brought up and Ms Behrman stated the patio should <br /> be of per able material <br /> VOTE= Motion made and seconded that a publicly announced hearing mus <br /> be field as the chAnges are so extensive. <br /> POPPONESSET BEACH: Snow fence. Ernie Virgilio came before the <br /> commission and a due to the amount of fencing requ i red, h e <br /> allowed o use metalpp ort in the round with guide wires a <br /> intervals to hold the fence <br /> Mrs. Ferriday asked if he could show where the fence is going and he <br /> stated Lisa is to tell him where to put it . He will monitor the fence <br /> and if it goes down , he will put it back u . <br /> Ms Behrman 3tated wood was requested as the snow fence mi ht <br /> buried- Lisa su aested the tie at * e bottom be of idnater i a l that i 1 i <br /> de8rade . Ernie s+ated e does no+,., feel the fence wi 1.1 o down t <br /> agreed i the Commisslon wants, it buried , good would he preferable . <br /> (See paSe 7 , amended Order of Conditions) . <br /> DAVID COLPITIS: Certificate of Compliance isued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.