My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/7/1988 CONSERVATION COMMISSION Minutes
>
1/7/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:03:46 PM
Creation date
2/16/2018 3:11:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/07/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> Meeting of January 7, 1988 <br /> Page 6. <br /> Herbert N. Warden: Letter from Holmes McGrath with DEQE letter of <br /> approval of the project was read requesting a Modified Order of Con- <br /> ditions to Al Bafaro. Plan was revised on [november 3, 1987 with a di f <br /> Brent footprint and septic system. It was deter ain+ d the Commission <br /> does not have the correct, plan. <br /> New Seabury - Promontory Point Watershed Plan. Revisions were approved <br /> y the Commission and a letter to be sent that changes were not mater- <br /> ial enough to require an amended order of conditions, <br /> .Certificates df Compliance Issued: New Se abu y Corp. - Snow Fence; <br /> Bourque -. SE 3-1 . <br /> Enforcement Order issued to .Jonar= The lot has been cleared and chipped <br /> , and a Stop ,' ork Order put on the property. A letter from the owner was <br /> read which stated no knowledge of the work. A revegetation plan will <br /> be requested. _ <br /> Orders of Conditions Issued= <br /> Vincent Priello <br /> Willow Bend - Pedestrian Culvert - Sewer & dater to be conditioned <br /> upon receipt o.f .the modified plan of dewatering area. <br /> Modified Ord-er of Conditions - Administrative action only to change u <br /> ownership from Bayview Builders to Shawn M. Jewell . Time fraise to re- <br /> main the same. <br /> Steven Ball ; Letter re reprised plans approved by Board of Appeals. <br /> Order of Conditions issued. <br /> Daniel Hostetter Enforcement Order: # evesetation plan reviewed. Lisa <br /> will be going out to the site. <br /> Quaker Faun Filling: Results from the Barnstable County Board of Health <br /> show low levels of Carbon Tetrachloride. On December 1.4 there were in- <br /> dications of Toluene and a trace amount 'of Styrene. No volatile <br /> organics and no contamination of Quaker Burt itself. Lisa advised she <br /> contacted DEE for the State ,level for Toluene and they stated there <br /> are no numbers and they could not act without the report. This, with <br /> other materials , was mailed to three people at DEQE with copies to Rep <br /> a it and the Selectmen. <br /> Mr. Rosenberg stated he would obtain information on Toluene. <br />
The URL can be used to link to this page
Your browser does not support the video tag.