My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/11/1988 CONSERVATION COMMISSION Minutes
>
2/11/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:08:11 PM
Creation date
2/16/2018 3:17:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/11/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> i Conservation Commi.ssion <br /> February ll . 1988 <br /> Page 3. <br /> taped after tine 'last earin He reviewed the requested item's <br /> listed in <br /> the minutes.' <br /> Ms Behrman st a • d. -the current toporaphy and proposed changes. must be <br /> on the plans. - <br /> Ir. Hoyland stated it is, not true it is a pure regrading, loam will <br /> have to be brought in. He requested a continuance. <br /> CONTINUED TO FOIA 5 - 8: 158 <br /> i0 - Al Bafaro, 64 Samoset Rd. Dock application. <br /> CONTINUED INDEFINITELY T THS REQUEST OF THE APPLICANT. <br /> The Commission was advised Mr. F osenb-erg has suggested the Commission, <br /> sometime Titin the nett month, hold a public hearing on proposed reg- <br /> ulations and propose to adopt the two page statement of requirements <br /> that . .ks included with the application; adopt all coastal regs and con- <br /> sider one additional regulation that when - a Certificate of Compliance <br /> is -requested, part of that request will require that an engineer' s <br /> certified .statement be submitted that the as-built situation conforms <br /> to the plan or stipulating when 1t does not conform. <br /> After discussion, Mrs. Marsters read to the Commission: under Certif- <br /> icate of Compliance, 10. 05 9D. if the project has been completed in <br /> compliance with plans stamped b -'•a..:r gi stered, pr es Tonal engineer; <br /> architect; landscape architect; - or land surveyor, a written statement <br /> by such person certifying substantial compliance with the plan and <br /> setting forth what deviations exist in the plans shall accompany the <br /> request for the Certificate of Compliance. ' <br /> I ' was agreed this is the regulavion as suggested. <br /> 8: 15 -- Andrew Kariotis (Rice Engineering) 10 Tide Run. Continued from <br /> 1/28/88. Mr, Kariotis advised the dock was demolished last winter and <br /> a notice of was filed in the spring which did not include the <br /> steps. In July, he fell through the steps and was hurt. A letter was <br /> titter' to John Var onda to amend the order of conditions to include <br /> the steps* The Commission asked for drawings for consideration. There <br /> was confusion and. ,the steps were 'Completed without approval . <br /> Lisa advised that John stated he did not authorize them and felt a sep- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.