My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/2/1988 CONSERVATION COMMISSION Minutes
>
6/2/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:11:36 PM
Creation date
2/16/2018 3:23:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/02/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> Meeting of dune 2, 1988 <br /> Page 5. <br /> bulkhead is under where the addition is going, he wants to maintain access to <br /> the existing baserpent. The amount of clearing would be the same. <br /> Mr. Coffey stated the work limit within the staked haybales gives 1 o feet within <br /> the area. If this is the construction access on the plan and the work limit is <br /> maintained, he did not believe it would be more detrimental . All work would be <br /> confined to the same vicinity and any soil excavation, as long as stored out b <br /> the road, would be no problem. <br /> Mrs. Ferriday questioned hew dirt would be removed without doing damage to the <br /> septic system. Mr, Palmatier stated they are not concerned about the septic and <br /> they could, as the lot next door which they own has been disturbed, bring the <br /> dirt out that way. <br /> Lisa stated there are trees between the lots which she would not want disturbed, <br /> She asked what would be used for digging and was told a backhoe, An 8 foot hole <br /> would have to be dug., <br /> Mr. Coffey stated,, where they set their own limit of work and holding to that, <br /> with ,the 15 feet it allows room for .the equipment to come in and do thework; <br /> procedurally it is doable. <br /> Mr. Burns suggested they remove the shrubs, remove the dirt and then go where <br /> it states Lot 520. The shrubs can be replaced. <br /> Mr. Palmatier stated they can mat over the septic system to spread the load. <br /> Lisa asked to be called before work starts. <br /> Mr. Palmatier stated they are aski-ng relief from special Condition 11 . He asked <br /> when into the project the Commission would like to see the rveet at i on plan. <br /> Ms Beh man stated as soon as Mr. Cariglia knows what he is going to do. Also, <br /> the Commission would like a schedule of when planting. <br /> 30 Waterline Drive. Steven Kroopnick stated he has a purchase and sale agreement <br /> on this property. There is an existing dock and float. n order of Conditions <br /> was issued in 1981 for the dock but the float was added at some time later. They <br /> are requesting a Certificate of Compliance assuring the deck complies to allow <br /> him to close on the property. <br /> Ms Beh rman stated a Certificate of Compliance could not be issued with the float <br /> sitting there. The owner should remove the Moat and apply for a Certificate o <br /> Compliance. <br /> Lisa read from the order of Conditions: The shellfish beds are a concern* <br /> Mrs, Ferriday stated that is why the float was not allowed. <br /> Mrs. Jacobson asked if the float was attached and was told it was. <br /> Lisa advised the float is 28-1121 X 11-1/21 , <br /> Ms Behrman stated an Enforcement order will be issued to the owner telling them <br /> to remove the float, <br />
The URL can be used to link to this page
Your browser does not support the video tag.