i <br /> r <br /> -Conservation Commission <br /> June 1 , 1988 <br /> Page 4* <br /> Ms Bern stated a line of haybals, on the plan for the. house -. <br /> construction, in poor condition, and equipment was on; the- edge. of the <br /> bank. Lisa checked a few times and everything was fine* During the- on- <br /> site yesterday , the hayba,les were on the edge of the bank- again. There <br /> is. considerable dirt and erosion going down the bank. Thiss- s in <br /> complete violation. This must be cleared ups before looking at.. another <br /> application. <br /> Lisa advised the house does not have a Certificate of Compliance. <br /> Mr. Rosenberg stated the Commission cannot act. <br /> Mr. Palma-tier stated Mr . Car i Iia owns lots 520 and 521 and. is <br /> adding on. to both houses. <br /> Mrs. Jacobson stated the Commission did a favor on the other lot <br /> t straighten out everything and it is being abused. <br /> Mr. PaInatier stated h.e. is at a loss. for anything he- carp. do..-. <br /> Lisa stated an Enforcement Order will be issued. - <br /> Ms <br /> ss ed. - <br /> roan stated the Commission will want the tap of the, area beyond <br /> the work- limit neve etated; the soil eroding down the well vegetated. <br /> I:oank pulled back, carefully. by, hard. A rkevegation. plan= should: be <br /> submitted to the Commission. <br /> r Rosenbert stated the Commission does not have the authority to <br /> nave two outstanding Orders of Conditions at any one time, aside from <br /> the enforcement order issue. <br /> Mr. Palmatier suggested one revegetation plan; they would not want to <br /> evesetate and rip it out for the pool . <br /> Lisa stated they are going to have to do it the way it was written on <br /> the original order o conditions. A certificate of compliance nrot <br /> e issued. <br /> =NTINUED INDEFINITELY, TC BE READVE T I S SUBSEQUENT TO CERTIFICATE <br /> OF COMPLIANCE AND CLQ I NG UP ENFORCEMEW I SSUS. <br /> 5 �- Colonial Gas- Coepanyi (Coastal Engineering3s inain along <br />' Route 134. The Commission was advised this project. is near the inter- <br /> section, of S. Sandwich. Road and Route 130. Iv is planned, to install <br /> 4, e gas mains just off the edge of the pavement between the, guard mail <br /> and the edge of the road, A silt fence will be installed behind the <br /> guard rail . It will be excavated and back i I I ed the same day. <br /> Excavated material will be stored on the pavement. I t should be <br /> finished within one or two- days. <br /> Ms Behrman stated the Conservation Agent should be notified three days <br /> in advance when. work will be started. <br /> Mr. Rosenberg asked bow they will interact with the steel culvert and <br /> was told they will be above it as they only go down 30 inches sa is m. <br />