My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1988 CONSERVATION COMMISSION Minutes
>
7/14/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 5:02:42 PM
Creation date
2/16/2018 3:25:39 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/14/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> ,duly 14, 1988 <br /> ' PaSe 17. <br /> 3 - Hyman Mirliss. Request for Determination of Applicability. To <br /> place a fully constructed- 8 foot gazebo within the buffer zone of <br /> Johns Pond and to hand clean the beach area in front of hir property <br /> border on Johns Pond at Lot 86 Sunset Circle. Mr. Mirliss. presenting. <br /> An area of lawn was eliminated as one of- the terms and conditions with <br /> the construction work done this past year. It was mulched with . <br /> plantings in the permit and ars area in the center was plain so. they <br /> decided to put in a fully constructed gazebo. He was unaware he needed <br /> a permit or approval . During a prearranged appoint2ent with Lisa <br /> Hanscom to determine. how much be could- do with his beach to stay <br /> within the law, she. saw the gazebo and ad' i sed. a permit was needed. It <br /> is 16 feet from one Borer o-f the house and 56 feet from the -other. It <br /> is 50- feet from the water and is on concrete blocks. <br /> Mrs. Ferriday stated, at the onsite, we went to, look at the area of <br /> beach Mr. irliss wanted to clear and in order that we could <br /> understand d what he was going to cle-ar, he cleared. It. Mr.. f irtiss <br /> stated he c l eared' hal f of i . <br /> Mrs. Ferriday stated re -fourtbs of what he wanted to do is -al-read <br /> done. <br /> Mrs. arsters. a ked' #gat was cleared.? Mrs. Ferriday pointed- t , a <br /> retaining wall on t .e , p- an. and- l-o . round�- indigenous vegetation. She <br /> advised he wanted to male the -whole area sandy; <br /> Mr. Mirliss advised lie also owns lot 3 . At one point, before my <br /> constru-ction.,. this -entire- beach.-. was -sand. Ten or twelve years ago he <br /> put 'sand there. Mrs. -- Ferriday stated that is not- indigenous- to%t e <br /> pond. <br /> Mr. MIrliss stated, no, it' s more or less in the area he wants to <br /> clean - but he doesn' t wan-t to -go that far; only the length -of b i . . <br /> retaining wall about -10 feet in different areas. He left the debris <br /> there to show what he -cleared, :.T :ere - is. a, lot- of. lea- es,- and Weeds-. o- <br /> ne - sand will be ad-d,ed. <br /> Mrs. Jacobson stated in the original, order of -conditions for the house <br /> e was told not to do any work is i d-e the work limit which is the <br /> ba bakes and the line where the wall isi. <br /> f <br /> Mfr. Mirliss stated no, the hayb les were way inside of the line and <br /> pointed to the plan. -They were way .inside the retaining wall . <br /> Mrs. Ferriday stated, and you- were told not to do any work beyond the <br /> work. li it. <br /> lir. - irliss stated his -awn: uses# to come right to the retaining wall . <br /> It- is exactly the, same wall that is there. <br /> Mrs. Ferriday stated her concern is that there is the retaining wall <br /> there is 12 feet of cleared space and there is more vegetation along <br /> the edge of the pond and the ve etation between the sand and the pond <br /> is going to disappear M <br /> The original order of conditions, S 3-632 was reviewed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.