My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1988 CONSERVATION COMMISSION Minutes
>
11/3/1988 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:03:30 PM
Creation date
2/21/2018 12:42:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/03/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Comm].Ssion <br /> !'I reM- ber 3, 1988 <br /> Page. 3. <br /> Mrs. Simmons suggested bringing the work limit up to the � c . <br /> i <br /> Mrs. Jacobson questioned the use of gutters and dr rwellsr r* Pavelick <br /> stated, if approved, they will be put on. <br /> Mrs. Marsters asked , if not br i aging in any fill , how the e l e a i n <br /> requirements wjL11 he met? <br /> Mr.. Pere l i ck stated the foundation will be sticking up out of the <br /> ground; exposed concrete. They sought the variance from the ACEC and <br /> for the 50 foot setback from the wetland. Mrs. Jacobson asked why <br /> they chase to go for that variance+ from' the wetland which is doing <br /> dama-ge rather than going -for the var-iance for the setback to the <br /> street? <br /> Pyr* Pavelick advised the owner wound like to have it as close to the <br /> bank as possible. They did pull it back and there was even a large <br /> deck pr'bposed . <br /> Pyr. Slavinsky stated he would have a problem with moving it back 20 <br /> ft. and- asked if the Board could live with 15 ft@ <br /> CONTINUED AT THE REQUEST OF THE APPLICANT. <br /> - Christopher Kord i s (Cape & l s l ands Sur v e i ng) To construct a <br /> single family residence and installation of a private well and sub- <br /> surface sewage disposal system at Lot 64 Buccaneer Way. <br /> CONTINUED TO NOVEMBER 1 - 7: 30 AT THE E E � OF THE APPLICANT. . ' <br /> 8 <br /> 1 - colonial . ' (Coastal- Engineerings uinaquisset Avenue. f <br /> continued hearing. Bob Dowling presenting. A letter from Earnest <br /> Vir.gilio was presented. Pyr. Dowling-'stated specs are verbal and <br /> ch nISe-% daily,. He has received no information from the Hostetter <br /> people as to where they are putting the water lire. In his talus with <br /> Pyr. Virgilio, they are trying to locate.-in the berm area.; 'initially <br /> they were going between the hardened sur face and guard rail . He does <br /> not want to be in the roan. The water trench would be probably a <br /> minimum of 5 feet deep and he does not want to be in a trench like <br /> that. He fears that if both are in that trench and it settles, one <br /> wi 11 blame the other for the settling. He asked Mr. Vi r ilio if that <br /> was a permit and he stated it was; <br /> Pyr. Coffey asked if their work was time sensitive and was told only <br /> the repaving which they would look to install prior to December 21 . <br /> Mr. Rosenberg asked if they would disturb Fria lines '-when going in with <br /> the water and her. Dowling did not believe so. <br /> HEARING CLOSED - ORDER OF CONDI TIONS IN 21 DAYS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.