My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/18/1989 CONSERVATION COMMISSION Minutes
>
5/18/1989 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 5:07:11 PM
Creation date
2/21/2018 1:47:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/18/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Conservation Commission <br /> lar .1 , 1989 <br /> Page 3. <br /> The original pian was to install the main between- the edge of the <br /> pavement and the guard rail . Plans are reprised to behind the guard <br /> rail. The 1ashpe dater [district is going to run a line in the area <br /> and who will install first is a question. They are working closely to- <br /> as there is very little room. Colonial Gas is ready to proceed. <br /> If it is required to move the line to the roadside of the guard rail , <br /> the water will have to go first which would put the gas a year from <br /> this date as they have not gone to bid yet. <br /> Ms Be roan suggested an extra erosion barrier around the base o -the <br /> spillway. There Is an upcoming State DPW project and it was sugested <br /> they be contacted. <br /> - r,,- Coffey asked if their' work was time sensitive and was told there <br /> are no restrictions on their State permit. They would install -150. feet <br /> per . day. <br /> s.. Be rman stated a silt screen would be' <br /> andit- oned 30- 60 feet up the <br /> - road and surplus debris to' be removed promptr. - <br /> Mr. bowl i-ng stated. there wil1_.,b_eno.;,o en- trench, the pipe will be put . <br /> .in .-and them filled immediately. With the grade changes, he. felt It <br /> ill.- be -foamed and biode8radable matting put down. <br /> Ms Blanchard added a note to the plan and ;initialed- it. - <br /> . Mr. Dowling - staged there are two lines. .,10*.--i e -arid " line . on top. <br /> The 1 " is' replacing an existing - Sm line -in questionable condition. He <br /> stated, Lt will e 5 feet,-- total depth. <br /> Ms Behroan asked for .a letter - of. modification a the two lines and <br /> depth of the trench. The Agent should be notified one week before work <br /> is. -started.. <br /> Everett Toer who stated he i .a Mashpee Indian asked for due respect <br /> to speak--but. did- not have any comments on. this project. e stated e <br /> was here-for the issues, to stop all the building. <br /> Ms Be rman advised the Commission has set e a ings for.. the evening and <br /> perhaps his genera concerns could discussed after. Mrs. Jacobson <br /> went with Mr. Tbey to-the hallway to discuss his concerns. <br /> HEARING T , BE CLOSED UPON RECEIPT OF AMENDED NOTICES . <br /> lox* <br /> 7:45 5 GEORGE A#M, BUTTE W T . Request for -Determination of Appli - <br /> ilit onro proposal to replace n existing wooden deck with a .-, <br /> p p n width towards deans Pond t <br /> pressure treated deck extended two feet <br /> 25 Uncatena Road. Mr. Butterworth was not present. Ms Behrman stated <br /> the project was very straight forward, The same sona tubes are to be <br /> utilized. <br /> VOTE: Motion vade and seconded to issue a na8ative determination, <br /> r <br /> NEGATIVE TEFF NAT G , <br />
The URL can be used to link to this page
Your browser does not support the video tag.