Laserfiche WebLink
I <br /> July , 19$9 Page 17 . <br /> is not ac tualiy a second floor deck, it is at grade. <br /> Mr. Burns pointed out no grade line is shown on the plan. <br /> Mr. Craig stated a new septic system was completed last week <br /> in the front of the house. <br /> Mr. c f f ey asked the elevation o the walkway and was told <br /> the grade tapers dawn, at the bottom is right at grade. <br /> There is a trough that runs at the back so that any water <br /> that runs down,, tapers o a large. area of vegetation. <br /> Mr. Burns expressed concern with a trough running down to a <br /> corner and with the vegetation that will be covered. <br /> Mr. Rosenberg stated this was pretty extensive for an RDA. <br /> Mr. Sherman stated it would not have been a concern except <br /> for the concrete drainage system. The c ncrete trench that <br /> runs along side the poo.l raises concerns that if these plants <br /> die from lack of light or whatever, thea this erosion has a <br /> natrural channel right down to the edge of the coastal bank <br /> along that concrete runway. Mr. Craig stated they did <br /> contemplate a selection of plants which would 'grow under that <br /> deck, three deep rooting varieties. <br /> Mr. Rosenberg stated, with an RDA, the Commission has no <br /> right to set conditions or teras or to inspect if we give you <br /> the go ahead. The question is whether the issues are complex <br /> enough to require. a Notice of Intent so that condi <br />