My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
12/12/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:09:55 PM
Creation date
2/22/2018 1:58:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/12/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASH <br /> PEE PUBLIC WORKS BUILDING COMMITTEE <br /> MEETING DE DECEMBER 12.) 1984 <br /> far the meeting of the Public Works Building <br /> The following members were presentsten Drown, Chester <br /> ' held a t the Mashpee Town Hall : Samuel C. Re, Che <br /> committee h Joe Di Ma <br /> sheets, -Anthony Ei orenti ni , John Wyllie, gDio and Ernest Virgilio. <br /> E11 •� Laycock was also present- and Joseph Murphy and Joseph Reardon were there <br /> � F <br /> for a short time after another meets nD f <br /> The meeting was called to order at 7:00 prm. <br /> with Ruth Paven, General Counsel of DC PD, who <br /> Mr. �e� advised he had spa{yen w1 � <br /> stated ted the town had correctly taken over that portion of the contract to do <br /> with site warp, she di d paint out that the handing c <br /> ompa n should he notified. <br /> o a letter and he would discuss the matter <br /> Joseph Murphy had advised to writwith Joseph Reardon. _ However, BahrWyllie felt that Ellis should sendthe <br /> he agreed. Ellis was <br /> letter er and after discussing this with Joseph Murphy <br /> asked <br /> to send the letter and stated that he would. <br /> Joe DiMaggio asked. what and who declared the emergency* <br /> Mr, Re <br /> stated it was declared In line with the contract* <br /> Mr. DI�a�� 1 iJ <br /> rF i o stated he had never received a copy of the contract. <br /> r�u s t he given v err to the can tractor. Then <br /> Mr. �� explained that several warnings i he does not, <br /> ' not* <br /> ice i s iven to increase his force. To the extent <br /> a five day tape over that portion of the work, <br /> the town and the architect can agree to <br /> which has nothing to do with the rest of the wank. <br /> �c D <br /> Mr. 4i Mai g <br /> i o asked, "The town, meaning who?" <br /> the town an - <br /> Mr, Re stated the town3, meaning d the building committee as the rep <br /> resentati ve, The Carrn�i ttee met as a whole and decided toask Ernest Virgilio and to <br /> i F al could with his work farce f to do as much as he <br /> to act �n their behalf <br /> the extent that anything on the doh i nterferred with his responsibilities as <br /> Director of Pu hl i c Works, he should arrange for equipment and services to cor�- <br /> � <br /> pl ete the job. <br /> • shed � several private Contractors in the <br /> Mr.� D�Ma���v stated he was approached y to ed his au thor i ter <br /> town who stated it was their Feeling Mr, Vi rgi 1�o overs pp <br /> • t was over $2000. a stat�n D� �n� out war� thaed he would not give the navesi with ten� e h � also stated he <br /> of the contractors and that hes i n agreement w n <br /> i r <br /> ' asked if the committee should go n this direct <br /> recti o <br /> was not notified or <br /> • d the meeting when the action was <br /> Mr. Re stated Mr. DiMagg i o did not atter <br /> agreed upon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.