My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
12/17/1984 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:09:13 PM
Creation date
2/22/2018 1:58:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/17/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T <br /> Public Works Building Committee <br /> Meeting of December i 7 , 1984 <br /> Page 2, <br /> (Ellis Laycock ealin Continued) <br /> completion,eti on, actual completion 76%5 <br /> for had ori��nal�� stated ��1 � d. <br /> The contras rove <br /> but th i's Wo u 1 d be <br /> cut back due to change orders not app <br /> The committee reviewed the requisition, <br /> Clerk of the �Jor�s . Ellis advised <br /> trailer er for the d about thefelt the <br /> John Wyllie ase � building, Mr.t Wyllie stated h <br /> the Clerk will be moved inside th <br /> trailer should be retained <br /> ed h grading, <br /> u� Item � ������ <br /> the re s�tion originally request rough <br /> Ellis stated � <br /> to be 100% complete. This�s has been changed to sero, <br /> Chain Link fence - $8700 allowed. $300 balance ante will coyer remaining work* <br /> � <br /> Site Utilities Not allowed. <br /> ��ude making the expansion joint <br /> Slab on Grade y El s pl a ned th's d 1 d not n , <br /> • Th i� �s a masonry item and corrective. <br /> in the East wall .l <br /> 04200 Masonry, <br /> asked $6420.6 - $4420 allowed. <br /> • the fan hole <br /> i r� the garage was too <br /> asked i f i t was cons�dered that{ "ned a three foot <br /> Bohn Wyllie as a corrective �tem. He explained <br /> s�jal Ellis stated this e blocks will remove easi lY t If <br /> linteled for and may be in so that the 's the only way <br /> s cal .t rust be paid. The retainage <br /> work i s done, proper or not, contractor has to obtain <br /> When sub-cc <br /> etinn is attained, he can be <br /> to correct t. s that they have been paid, <br /> lien waivers from al sub-contractor items. <br /> retained untl <br /> 1 the correction of the punch 1 s t <br /> tai na e If it took <br /> � � $400,000 there wou1 d be ���,��� re � uest <br /> Mr. Re stated as ofwould this be a legitimate red <br /> - $209000 to re air the one expansion .�o�nt� wop u 1 d be. <br /> El 1 i s stated it wo <br /> for use of the retainage. <br /> re a r the expansion ion joint las <br /> ` as fed <br /> John f the contractor refused to P <br /> y�l �e <br /> ' someone e 1 se to do the work. Ells <br /> requ <br /> es ted i f <br /> it would be legal to hire <br /> �= stated i t was, <br /> structural steel -100% Complete eta -� $300. <br /> it a <br /> Rough Carpentry entry - g8% Complete $320. <br /> Asked $1950. <br /> 67% Complete , Allowed $12501. <br /> Finish Carpentry _ <br /> s u os ed to be laminated wood ,beams, <br /> Re uestion Ellis on #06170, sTR s pP osed to be a savings of <br /> Sam q was being held and there was supe <br /> 1. <br /> He noted only <br /> $200 <br /> $1 ,000 per Aaron Coheni n not using the l aminated. <br /> d last month and this will have to <br /> was noted the entire amount was approve A <br /> it e asled Ellis s to pursue the matter.. <br /> be handled ed i n a change order. Mr,. R with plus or minus change <br /> • s made that Aaron Cohen cone I n w p <br /> previous 1 eu t Y7 items 11 quest'4 tion <br /> 1 <br /> to <br /> the contract for the several <br />
The URL can be used to link to this page
Your browser does not support the video tag.