Laserfiche WebLink
Public Works Building Committee <br /> Meeting of December 19, 1984 <br /> Page 2* <br /> the meeting when Jack Cartier was present that <br /> Mr.F �e stated �t was agreed at the stakes.� Jack was net <br /> d set the grades and Mr. virga l l'o would set <br /> he wool ed so the grades were set b. a Mr. MacDonald, <br /> present on Saturday, as expect <br /> et the rales and the work was performed in <br /> Aaron Cohen stated Ernie Vi �� �� s� � g <br /> accordance with the grades he set. <br /> Mr, Re stated the work was done <br /> in accordance with the grades set by the draw- <br /> 4 4 <br /> in9 s , roving hack from the buIldIng. <br /> • far as the revised drawings provided by the <br /> Mr. Cohen stated his point �s � as <br /> architect tect to our firm that had an elevation of finished grade, does finished; <br /> grade out there correspond to that number, <br /> John Wyllie- asked i f the grades are <br /> set to the correct rate and If disputed , <br /> Mr. Cohen should set up a transit and check i t. <br /> ' disputing uta n its but grades rust be gotten from some- <br /> Mr.. Cohen stated he s not p g re determined from <br /> where and would like to know where the grades we <br /> 4 in the back was I" and 1 o C . He stated <br /> Mr. Re asked Mr. 1rglo �f the grade <br /> it was. <br /> some low s ots caused by the previous bull - <br /> dozers <br /> u l 1 -- <br /> John Wyllie explained there were s p He felt the grade <br /> he septic system had not been back-filled . <br /> doers and t � <br /> looked close. <br /> set were within r� plus or minus 3/4�� to the <br /> Aaron Cohen stated the grades when � is, were they? des , <br /> grades shown on <br /> the architect' s drawings, The quests on <br /> ' ro ri ately l owes' for some reason, perhaps due o <br /> or no. if they were set i nape p . a ro r 1 ate 1 n the field , but <br /> site and possibly what Mr. Virgilio did was • pp p town and <br /> the 1 have serious consideration between the <br /> what I am asking I s because <br /> my sub--contractor. <br /> • tonight was supposed to be <br /> DiMa io stated the comms ttee s special meeting <br /> g be acc� <br /> Mr, 99 <br /> • e money* it was his suggestion that the money <br /> very <br /> brie to approve thd when Mr. Cohen could be <br /> e ted under protest and a later meeting be arrange <br /> p <br /> present with his attorney. <br /> i d and would not ask anymore questions <br /> Mr. Cohen stated he respected what was sa attorney regarding the <br /> i cal ende advi sed he had talked with his y <br /> :. on the technical genera contractor and also, relative to <br /> wayto town pr'o�! inotice to the <br /> s tl ated• His attorney i s requests sting that <br /> the cost. This will have to be i nve g <br /> 3 <br /> no funds be disbursed from the <br /> General Contractor <br /> s account until the town <br /> counsel meets with his attorney or talks with him* <br /> +' <br /> ile and they did the work on the instruct- <br /> Mr. Re stated the town hired <br /> ed these people <br /> 1. <br /> ion from the town and it <br /> is certified. They will have to be paid <br />