Laserfiche WebLink
Wars Building committee Public Meeting of December 1 9, 1985 <br /> Page 6.. <br /> . <br /> baron Cohen stated either Triple� A does the job, o r <br /> the second low bidder, <br /> but he would like an answer by tomorrow. The risersand treads can be used <br /> ed <br /> well to break even, which is less <br /> by anyone. He would need $900 per s to i r <br /> than the seconds low bidder. <br /> � <br /> sane <br /> the problem bl em with the glass man. <br /> Mr. Re asked if there was <br /> ' that the glass man , when the <br /> d he had a report from Jack Cartier as controlling <br /> ng <br /> Mr, Cohen state and released the order but has troublein 1 <br /> frames were ready, measured a to the gobs i to and that he install <br /> �e stated he will request he core stating why they <br /> delivery. or et an aff adavi t from his supplier <br /> the glass icor ed i atel l inform Ellis of the suppliers name. <br /> cannot get <br /> it on the job sooner. <br /> He will <br /> � <br /> it was agreed that Ellis would check into the stairs in the morning* <br /> After <br /> discussion of Change Order <br /> accept Change Order #55 as wry tten. <br /> VOTE: Moved and seconded to p voting for. One abstained, <br /> Four members � <br /> The co <br /> rmi ttee reviewed the requ i s i ti on. <br /> • to be looking for an extra because <br /> Aaron Cohen stated the fence man is going <br /> returned and he had a compressor <br /> ed his osts . In goad faith he r~� as the of es were <br /> some <br /> removed p He will be looking far $400. p <br /> to punch holes in the pave ng`. <br /> rer oved without our authors y. i <br /> .? be <br /> spent because the machine <br /> that so rush hand labor was g p <br /> Mr.* e e pl a ned was s aved by removing the fence <br /> back and forth that a l o t of money <br /> could not go <br /> = d he understood, however, the fence ma <br /> n had to come boo and i s <br /> is Mr. Cohen state <br /> due an f extra r <br /> were removed by Masasch1 an <br /> some b the commi tte e* It <br /> Ellis stated some poles res ons i bl e for whate <br /> woul <br /> Id be di f f i cult to as certa n who s resp <br /> on <br /> the 1 i s i n place but the pump <br /> is not installed. <br /> Ellis stat <br /> Mr, Cohen stated he assume i t has been installed. <br /> i; <br /> al d back until it is veri Med e that <br /> y o-stated the s item <br /> should be <br /> Mr. Magg "s listed as being 100%. <br /> it is in <br /> stled as it <br /> . �ece of the <br /> service station equipment. He <br /> is Ellis stated he checked every p thing seems to be unbento <br /> tried every <br /> a and slide mechanism and every <br /> d been approved, On the front <br /> !� e orders erre and two have alrea � change <br /> � He stated Chang tract sum <br /> Then net change by <br /> is a requisition si tion i s the original con The new contract sum i s <br /> page of th q which Aaron contests, . <br /> orders which deducts $10,254.31 , � . <br /> . $16s235,855l retainage <br /> mage <br /> 1 ete and stored to date $324,71.7. $214,,113. The <br /> $3905901 .690 pomp 15. rev ousl Y pas d �- <br /> ned 1 ess retai na e �. 3C$,481 , <br /> Total oar' 94,368.15. <br /> total for this payment <br />