Laserfiche WebLink
Public Works Building committee <br /> Meeting of December 19, 1984 <br /> Page g. <br /> Ellis gave copies of this disbursement sheet to the committee. <br /> Mr. Eiorenti ni reported on the floor tile. He stated he has a quote for <br /> 2698.00 for the same quality floor material as quoted to Mr. Virgilio . <br /> Breakdown of $1 .23 sg.ft f installed for tile - .65 ft. for cove base installed. <br /> Ellis advised Mr. Cohen to discuss with Jack Cartier the removal of fill i n the <br /> back area of the salt shed. The slope behind the fence i s almost vertl caland <br /> not as shown In the drawings , Mr. Cartier has given the nave of a Mr. Tobi a <br /> who is interested in the fill <br /> Mr. Cohen agreed to look into the matter. <br /> He also stated that at the next meeting he would like to summarize extensions <br /> of time on all the change order, <br /> Mr. Re gave Aaron Cohen a copy of the town labor charge* <br /> No further business to come before the committee, meeting was adjourned at <br /> g:3g p,m. <br /> Respectfully submitted , <br /> Diana M. Lund <br /> Recording Secretary <br /> CC: Selectmen <br /> Joseph Mu rphj <br /> E. Virgilio <br /> El 1 i s Laycock <br /> Leo Sweeney <br /> Aaron Cohen <br /> Jack Cartier <br /> Verne polka <br /> coma ttee <br /> i' <br /> I <br />