My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/9/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
1/9/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:07:39 PM
Creation date
2/22/2018 2:01:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/09/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public forks ui1ding Committee <br /> Meeting of January 9, 1935 <br /> Page 3. <br /> There was lengthy discussion of <br /> the bill from Lawrence Lynch and the concensu{ <br /> F a1 di sac royal for~ the amount of the overage. <br /> is genet disapproval <br /> ' the vote to approve payment for the <br /> VOTE: Moved and seconded to rescind and to approve payment <br /> �qa Department <br /> ��gh � labor amount of $2335.00• e Lynch i n the amount of $15,179-86. <br /> of the entire bill to �.awre�nc ,Y against the $3 ,039-86 <br /> The <br /> amount due for town labor to be negotiated <br /> overage. Unanimous Vote. <br /> • d stated the committee has caused <br /> Verne Polka arrived from another' meets ng an for the payroll could <br /> d move not appropriated ated and the funds p . d. <br /> the town to epee � of general funds and must be reimbursed. <br /> not be held back. This was paid out g <br /> ' e Architect tett that i n the spring Ernest <br /> The Committee was i n agreement,w�with th to be paved to <br /> T paving from areas not scheduled <br /> Virgilio should remove the � g , <br /> allow for the cement walk and landscaping. <br /> • Ellis suggested es ted the Fawn seal could be <br /> Concerning a ague far the building, 9g and the off ice <br /> made put on the building 1 d i ng between the door' a <br /> grade up i n porcelain and � i 1 di n under the seal or in- <br /> with <br /> n-- <br /> with a small bronze plaque commemorating the bu g <br /> s ide the door. <br /> • i t appears the removal of the fill mai <br /> Ellis also advised the committee that �� <br /> be soon and as the excess fill is removed, the area will be graded. <br /> • e ravine on the north side and Ell i <br /> 11 i e as ked abou t the grads ng down the e to be bui 1 <br /> Mr. I .y y to be stabi I i zed and a berm wi 11 hair <br /> advised the slope w�11 have o o. ressi ng up the slope at <br /> a to direct water to where it wants t g <br /> at the top <br /> site <br /> work w*11 be done at an appropriate timet <br /> F not installed. Ellis agreed to <br /> It was noted the tee for the septic tank i s <br /> check on the matter. <br /> • tis not <br /> Elldistributed i n the <br /> ' stated the water i s to the building,d ng, bu <br /> s st <br /> • no dan er of pipes freezing. <br /> building and there is g <br /> the concrete El lis stated <br /> i n the letter from Lawrence Read, Mix an he next mee <br /> Concerning . h him, and asked this <br /> be deferred to t <br /> he has information, not w1 t <br /> . r he second floor concrete have not t <br /> committee was adv'sed the tests fort been delrtvered. P <br /> The the front have be <br /> redei ved. The back stairs are in process <br /> i 1e is Rating for the heat in t� <br /> j <br /> louvers are delivered, not installed. Tr p <br /> • Ellis i s and Aaron Cohen are in agreement <br /> building ng and . <br /> 1. for 15 lockers at $65.0( <br /> l noted Ernest ��rg�1�o has received proposals e <br /> I t was this i n abeyance unti l a later dot <br /> each. It was agreed to hold <br />
The URL can be used to link to this page
Your browser does not support the video tag.