My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/28/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
>
5/28/1985 PUBLIC WORKS BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 5:15:50 PM
Creation date
2/22/2018 2:16:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PUBLIC WORKS BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
05/28/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUBLIC WORKS BUILDING COiMMITTEE <br /> MUTING OF MAY X85 1985 <br /> The following meirbers of the Public Works Building Coiiiiiittee were present <br /> for a meeting held at the public Works Facility: Samuel C. Re, John Wyl l lCA <br /> Chester Brown 5 Anthony Fi o re nt i n i and Chester Sheets. <br /> Ellis Laycock was also present. <br /> The «feet i ng was called to order at 7:10 p.m. <br /> Mr. Re read copies of several nienios addressed to Ernest Virgilio in answer <br /> to memos received, <br /> Mr�. Virgilio' told the corm i tt-0.e. ...f t h s feel. ng the sphal shots <br /> be removed from the north side at the roar right door as after the first <br /> winter there are apt to be washouts and water under the asphalt. He also <br /> stated it is planned to use that area for things that need a bard sur- <br /> face, such as a truck wash station for town vehicles. He was agreeable <br /> to the removal of asphalt on the ether side. He stated he has 13 yards <br /> of loom and 1000 flowers for landscaping purposes. <br /> Ellis suggested that the asphalt be removed forward of the well and <br /> crushed stone put in as a test area. Water coming off the roof would <br /> go through the stone and into the sand, It i s his feeling that water <br /> off the roof onto the hot top could give an icing condition. He also <br /> stated he would like to see the proposed island put in the front to <br /> prevent parking there. <br /> Chester Brown suggested Mr. V i rg i 1 io have the selectmen write a letter <br /> to the coninittee requesting a change in design to allow the asphalt to <br /> be left where it is in order to relieve the committee of responsibility <br /> as this is against the recommendation of the architect. <br /> It was agreed a letter will be sent to Mr. Virgilio acknowledging his <br /> request that the paving should be left on the north side of the bu i 1 di ng <br /> andg ran ti rig committee approval . Asphalt wi l 1 he removed from the other <br /> area. <br /> Mr. pe referred to Mr. Vi rgi l i o's memo concerning the minutes of April 23 <br /> and read the paragraph in question pointing out that it stated that Aaron <br /> Cohen came to the facility to put Mr. Virgilio on notice that the gas bill <br /> belonged to the town <br /> It was agreed that the selectmen or town counsel should contact the comm- <br /> ittee directly concerning any questions or problems involving the facility <br /> or committee meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.