Laserfiche WebLink
4 <br /> Public comments were requested: Ione. <br /> NOTE: Motion made and seconded to find a negative determination <br /> with the condition of a site visit by Conservation Agent or <br /> Commissioner. <br /> Unanimous Note. <br /> NEGATIVE DETERMINATION WITH CONDITIONS, <br /> ERTRU DE BARROW DOUGLAS for the installation o f a full <br /> foundation under an existing home; 2-15 ft. retaining walls; <br /> one 30 x 5 ft. retaining wail; trench for water pipe; and removal <br /> of two oak trees at 34 Pimlico Pond Road, Dan Lindberg <br /> representing. oak trees are mostly r dead wood from storm damage. <br /> hair bales on site. order of condition to provide receipt from <br /> the purchase of appropriate grass seed mix was agreed. Retaining <br /> wall must be kept to 5 feet otherwise Engineering plan will <br /> e required. Board of Health approved as basement only, no <br /> increase in living space. <br /> Public comments were requested* Ione. <br /> NOTE: Motion made and seconded to close the hearing fending <br /> receipt of a number from DBP. <br /> Unanimous Vote, <br /> CLOSED PENDING <br /> JOHN o' TEILL, for a modification of an existing dwelling; <br /> relocation and expansion of bathroom; and utility room at 2 <br /> Ta rail Warr. alike Grotzke presenting. Hearing to be continued <br /> complete plans to follow. <br /> Public comments were requested: To follow: <br /> Frank Na rat i o, 25 Ta f f r a i l Way, objected to a prolonged <br /> structure, but it was noted that this was not a Wetlands issue. <br /> CONTINUED To 19 MAY, 1 - 7:00 P a M. <br /> PENINSULA COUNCIL, INC, for a Determination of <br /> Applicability on a proposal to sweep and repave roads with 1- <br /> 12 inch overlay in existing paved areas and cleaning and <br /> restoration of existing drainage structures at Rock Landing <br /> and Watling Place. Mike Grotzke presenting. Rock Landing was <br /> discussed first. Mr, Lesrosiers stated that there would be <br /> no vote from him due to construction and installation of catch <br /> basins already started without commission approval. No plans <br /> were submitted nor any verbal discussion occurred regarding <br /> this work. question was raised whether basins are in purview <br />