My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/1994 CONSERVATION COMMISSION Minutes
>
11/3/1994 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:08:22 PM
Creation date
2/23/2018 1:28:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/03/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
satisfied to have one bog flooded and the lower dog drained. <br /> concern would be the drawdown on Johns Pond as he would <br /> have to draw from the pond again. <br /> Mrs, Ferriday and Mr. Homeyer were consulted and it was <br /> agreed to let him go ahead with the plan as it stands now. <br /> He should finish sanding on the bog he is on now and that <br /> water will he released in a timely fashion; the other- one <br /> would then be flooded and the saute thing will occur.. <br /> i <br /> Mr, Homeyer advised Steve Ball complained he gets loft out. <br /> i <br /> Mrs. Ferriday stated a letter will he written to Brian Handy <br /> that will cone down hard and let him know this is the <br /> Conservation- Commissionfs hog. if he does this again, she <br /> will go to the Selectmen because he is not following the <br /> lease. <br /> Mr. Homeyer pointed out the Commission took a vote that they <br /> did not wish to be in the cranberry business that was never <br /> rescinded, <br /> Mr. Green's first concern was the herring.. He chid not }snow <br /> that trout spawned at this time of year, If there i <br /> spawning trout and it does interfere! this Board cannot <br /> consider- allowing the sanding to go on, <br /> Mrs* Ferriday stated the Commission will make sure he has <br /> been given a time limit, <br /> Mr. Sherman advised he had been told it will be two more <br /> weeks. <br /> Mr. Homeyer stated the lower bog was to be opened to allow <br /> the sand to settle down, <br /> Mr. Sherman stated Steve Hurley had serious concerns, <br /> Mr, Homeyer stated Brian has a contract with the Selectmen <br /> and the Commis ion i s supposed to oversee the Coramt i s s i n,"s <br /> rules and regulations, <br /> Mrs. Ferriday will get it clear exactly what is being cone <br /> and when. <br /> The Cranberry Commission is to be reconvened. John <br /> Fitzsimmons agreed to participate with John Johansen and <br /> Gertrude Ferriday. Meeting to be held on Tuesday, November <br /> t 3: 00 p,m, Steve Ball will be invited* <br /> Soil Conservation Service has been working with Brian Handy <br /> on a dike. It can be done under normal maintenance. The <br /> Agent is concerned about water levels. He felt expert advice <br /> was needed and suggested using cranberry bog money to hire <br /> Horsley & Whitten. <br /> VOTE: Motion made and seconded to have the Agent contact <br /> Horsley & Whitten to see if this is in their line of <br /> expertise and ghat they would charge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.