Laserfiche WebLink
- - <br /> 8:00 CGP REALTY TRUST to construct a single family dwelling, <br /> garage, deck, driveway, septic system and utility services at <br /> 240 Surf Drive, Dearing continued from January 19, John <br /> Slavinsky presenting, The first presentation did not have <br /> the 50 foot buffer. He has moved the house forward. They <br /> will be going before Board of Appeals on February 18 for <br /> ft. zoning relief from the street. They have applied to <br /> Board of Health for Title v variance of 6 ft. from 10 ft. <br /> Approval has not been received yet from either one. <br /> Mr. Slavinsky stated the house is only 26 feet deep. It was <br /> agreed to have a paved apron on the driveway with the <br /> remainder pervious. There will be a drywell off to the side <br /> of the garage door. They will run gutters across the deck, <br /> They will have to ask for a variance on the reserve; they <br /> cannot change the system. They need 100 feet and 25 feet <br /> from the catch basin, Io feet from the street and 20 feet <br /> from the basement wall . Mr. Slavinsky talked with the Board <br /> of Health and they do not have a problem with the project. <br /> It is appropriate to ask for a 4 foot variance to the street <br /> line. He is providing everything requested. <br /> Mr, Homeyer questioned the septic in the driveway and was <br /> told it is a reinforced cover. <br /> Concerning the number of bedrooms, plan before the commission <br /> is three bedrooms; the septic is out of their jurisdiction. <br /> Mr# Slavinsky stated if everything is okay, he would be <br /> willing to go to a two bedroom. This can be conditioned and <br /> he will change the plan. <br /> Mrs. Ferriday stated architectural plans are necessary. <br /> Mr. Slavinsky agreed to submit them. <br /> Mr. Sherman questioned staying within the work limit. it is <br /> a frost wall. There will be a pre--construction on-site. He <br /> agreed Mr, Slavinsky has done all he can do. They will have <br /> to be careful with the work limit* <br /> Public comments: none. <br /> OTE: Motion made and seconded to close pending architectural <br /> plans showing a two bedroom dwelling And receipt of <br /> Board of Health and Board of Appeals approval, <br /> Mr. Sherman will provide a letter to the Board of Appeals. <br /> Lam: Theon-site with DEP is scheduled for February 1 , 1995 <br /> at 1I:00 a.m. <br /> The Agent requested if the Commissioners attend, that there <br /> be no internal discord on positions. <br /> OFFER of TSD: The Lopez family have offered to sell a 1 <br /> acre desirable parcel of property. It was agreed the <br /> Commission has no available funds and the offer should be <br /> passed on to the Selectmen. <br />