My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/30/1995 CONSERVATION COMMISSION Minutes
>
11/30/1995 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:09:34 PM
Creation date
2/23/2018 1:56:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/30/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 November 1995 <br /> Page 2. <br /> I&. Desrosiers asked, what if they find the contamination is in the direction of the water? <br /> 1s Capone stated it is 150 feet away. The plan is to the scale of 1"=60. The highest levels <br /> of con 'on were in the well. The main issue is that it is causmg to get in where <br /> there are tidal influences. They wiU be putting in more monitoring wells at some time after <br /> they are fished with the excavation. That will have to be addrened in the fut . <br /> W. Desrosiers pointed out they do not know how far they have to go. NU Capone stated <br /> aground 100 y `4 by the state. There are four monhoring wells. <br /> ilr. men stated there is ground watcr flow that heads south in that are& He asked hog <br /> large the plume is around this? Its Capone stated it is sitting on the face of the ground <br /> water and must be contained. <br /> A& Fitzsimmons shared 1W. Desrosiers concerns. <br /> A& Capone stated they would be removing the source. Tey cannot go all the wary under <br /> the well t where i was, that is not the ob,sect of their wod , only to remove the source and <br /> containment under contingency levels. They do not expect to find very high levels. It is <br /> mai*ground water cin ion. <br /> l r r. Sharpe asked why they are removmg the tank. NU Capone adV=d DFP. issued an <br /> Order of Responsibility. The Mate would tell them to go ahead if there is a problem.. <br /> A&. Desrosiers asked if they would be allowed to fel #hat pit if con ted sow were <br /> found? They would be bacUUing that hole for safety rewom and because of ground <br /> water inuudon. They are allowed to leave any behind if they cannot feasibly remove them. <br /> There is asphalt alb the way down; the tank has asphalt over it. <br /> Mr.r. Burns stated the tank could have been used for anything on that Island, it was used by <br /> the MiUt ry. The bank is assuming the tank is causing this Benzene problems. It was never <br /> in use since they owned iL <br /> lair. Fitzsimmons asked if it is in the ACC and it is not He asked why it is being handled <br /> as an RDA? <br /> A& Sherman advised the alterations are being done in the flood zone. He stated, if the <br /> Conunmwwon wishes, he can talk with Elias McQuaid and the Fire def. <br /> lir. Desrosiers asked who would be involved from DEP in Lie That would be Dan <br /> Grafton. <br />
The URL can be used to link to this page
Your browser does not support the video tag.