My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/30/1995 CONSERVATION COMMISSION Minutes
>
11/30/1995 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:09:34 PM
Creation date
2/23/2018 1:56:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/30/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s <br /> o November 1995 <br /> Page 4. <br /> 7 to JABS W. FLANDERS for proposed house demolition and tion; fence <br /> reconstruction, cxisng septic tank relocation and constriction of an open-jointed die <br /> patio at to Cross Streets John Shwinsky presented abutter notification receipts. The <br /> project st ated out as a rehab and a new septic was installed four months ago. The <br /> building deparunnt suggested the foundation was not suitable to increase the fiving space <br /> so on the &ms submitted the dotted fine is the existing footprint, solid line is proposed. <br /> The cxistrtng concrete patio in the back would be removed.. They propose to repair the <br /> existing fence also. <br /> A&. Sherman advised a letter was received from an abutter. He stated even the patio <br /> extension is within the area; it is flat with no rm-off. The new patio is 35 feet <br /> from the top of the bank. This meets all the performmee standards. <br /> The letter from Muriel l eadel was read into the record by the Age He sued the <br /> Commission cannot address view or rui-stay house yes. Also, it no jurMetion <br /> over the height of fences. <br /> It was noted Boardof Heahh approval was roctive4i The septic tmk was done bul was <br /> close to the foundation so they moved it because of the new footprint. <br /> Conceffing the open jointed patio, it should drain and the Agent had not concerns. He <br /> asked if the client would be wMing to put a sn n berm at the edge of the cliff and vegetate <br /> W A&, Slaviwky sued he could put a brick berm at the edge of the patio. He wW provide <br /> a memo to confum this. <br /> Ir. Johansen advised the DFS'number has not been 'on for is rMussm" R: <br /> and Board of Appeals wM hear this on lk c=bff 13. <br /> VOTE: Motion made and seconded to close subject to receipt of Board of Appeals, <br /> DEP number, and a memo on the bean and revegetation at the edge of the patio. <br /> CLOSED PENDING, <br /> 7:20 ROBERT E. LEE, 51 Bayshore Drive, continued from November 30, 1995. Dave <br /> S r do i Presented abutter notification receipts. "There was a previous Order of Conditions <br /> issued for#his location which expired. The agent has visited the site and there is concern a <br /> to where the coastal bank may be. There is a bund in one or two locations which could <br /> move the definition o coastal bark right to the back of the deck. If he tc>ok two more <br /> shots, the coastal bark could pop up on one corner of the house. It is 54 in the center t <br /> 56 to 71. He is locked into the ref=ce pian for the well and septic system. If the top of <br /> the bank carnes in, the septic is within the ju"ction of the ion. He asked if the <br />
The URL can be used to link to this page
Your browser does not support the video tag.