My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/11/1996 CONSERVATION COMMISSION Minutes
>
01/11/1996 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:02:58 PM
Creation date
2/23/2018 2:01:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/11/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 Janes 1996 <br /> Page 3. <br /> 7:40 JAS A- LANGBERT to license and maintain an existing platform, ramp and <br /> float and to construct a new wooden bulkhead in front of an existing wooden bulkhead at <br /> 26 Spoondrift Circle. Dave Sanicki presenting with fir. LangberL Abutter not cation <br /> receipts were provided. An adjacent proper owner's license showed an existing wooden <br /> bulkhead in 1970 with a ramp and Moat srstern. The float has been in the water since <br /> 1983. <br /> �. Sherman asked if the Chapter 91 plan is for the sarnne property` 1&. Sanicki Mated it <br /> is just shown. The float orientation was changed in 1983. The entire struetm is not <br /> licensed. <br /> l&. Sanicki stated the construction will be in front of the existing bulkhead which is faking <br /> in and they wish to lice what is presently exisfi . The bulkhead does continue onto the <br /> adjacent property;it is going the sane distance as the old bulkhead. <br /> fir. Sherman asked if the additional bulkhead will stop at the property ane, and it will. He <br /> asked the methodology 1r. Sawicki stated there is ample water. Where is no access from <br /> the upland so it will be done by urge. <br /> Mr. Shem an requested a b of narrate from the he contractor on how it wiH be gone. <br /> lr. Sanicki stated there is no contractor presently as appraval not yet rece red, but they <br /> will provide this when one is on board. Xft. Sherman will condition no work to start until <br /> this is received. <br /> The Shellfish Warden advised he has no o n em . <br /> fir. Shemian asked for a description of the boats using the structure` was told there i <br /> a 30 foot Wellcraft, drawing 3 feet of water. Them is 7 feet of water on the oar side o <br /> the dock. <br /> A& Sanieki stated a'pre%iously proposed boat lift is not god to be done. The depth of <br /> the propulsion unit is 3 feet. <br /> Public comment:none. <br /> VOTE: Motion made and seconded to close the hearing pend receipt of DEP number <br /> and revised fees. Unanimous Vote. <br /> i <br /> 1t will be conditioned that a constiruction narrate be prodded prior to staff of work. <br /> CLOSED PENDING DING R CET OF DEP NUMBER AT REVISED FEES. <br />
The URL can be used to link to this page
Your browser does not support the video tag.