Laserfiche WebLink
Page 8. <br /> rued at the request of the Harborniaster, were reviewed. The float was 8 feet further <br /> into the channel and the Harbormaster asked that it be pulled back. The Sheth Warden <br /> wants float stops on the inside of the float for low tide situation. Other pion is the ramp <br /> up to the existing deck at the house. <br /> I r. Sheronan asked the depth from the propulsion unit? Mr. Sani ki stated the owner does <br /> not presently have a boat; that can be conditioned. <br /> The Shush Warden's request will be made in writing. <br /> They are awaiting a IEP number and approval of Board of Appeals. <br /> Public comments: none. <br /> VO'C'E: Motion made and seconded to close pence IEP number, Board of Appeals <br /> approval and a letter from the Shellfish warden. Unanimous dote. <br /> CLOSED BENDING. <br /> 8:50 MAS)HPEE LAND INVESTMENT LTD. PARTNERSHW, 608 Great beck <br /> Road, continued from 4 April 1996. A continuation requested. <br /> VOTE: Motion made and seconded to continue to 2 May 1996 at 7:40 at the request of <br /> the applicant. Unanimous Vote. <br /> HEARIING CONTINUED TO 2 MAY 1996 - 7:40 AT THE REQUEST of THE <br /> APPLICANT. <br /> JERALD G. FISHMAN for the construction of a coastal dune and bank to match <br /> the grade of the adjacent dune and bank located at laushop village properties and <br /> construction of a coastal bank and clue walk-over structure at 684 Shore Road. Nonan <br /> Hayes presenting. Abutter notice was pro ided. He advised when the Maushop revetment <br /> was permi <br />