Laserfiche WebLink
22 August 1996 <br /> Page 9.. <br /> AIr. Sherman stated he is meeting with 1r. Bath at the site to make sure <br /> there is no Bordering Vegetated Wetland or that the dock begins in a BVW. <br /> DEP did not require flagging at the last on-site. Chapter 91 is a separate <br /> process. <br /> Mr. Connors asked if the wetland will have to be shown on this plan? <br /> Mr. Sherman stated if there are impacts, it wiR have to be shown. It i <br /> possible he may have to extend the ramp to go over the wetland. <br /> Mr. Rosenberg stated the ramp is the issue. <br /> Mr. B ath stated his intention was to put the ramp at the beginning of the <br /> water. He asked if the dock is supposed to be in the same location from year <br /> to year? And, if it is not? <br /> Mr. Sherman stated it cannot impact. He might have to make the ramp <br /> longer and start at a higher point. <br /> Public comments: none. <br /> VOTE: Motion made and seconded to continue the heari <br />