My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/10/1996 WATERWAYS COMMISSION Minutes
>
9/10/1996 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 5:25:55 PM
Creation date
2/23/2018 2:37:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/10/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page <br /> Waterways Commission <br /> Minutes-revised <br /> September 10, 1996 <br /> QLD BUSINESS: <br /> BARB RMA PORT; <br /> 6 <br /> Perry Ellis,Harbormaster, updated the Committee with th respect to the <br /> recent effects of Humcane Edouard. As noted, there was minimal damage <br /> to buts and docks as a result of the grind direction and related tidal flow. <br /> Mr. Elks reported that there was some erosion in <br /> the area of � <br /> Popponesset Spit andin the east sect on of Wa uoit Bay. <br /> All channel markers were removed from Po ane ' <br /> �p sset Bad poor to the <br /> storm, and have been returned to their positions reported Mr. Ellis who <br /> noted that Falmouth lost some navigational equipment in Wa uoit Bay. <br /> Mr.Ellis indicated that the month of Augustwas a busy duri'ng all . <br /> weekends with steady rm"d-reek boat traffic. <br /> It was noted that Mashpee anticipates the effects of Huric n <br /> P a e Hortense <br /> b <br /> Saturday of this vee . <br /> With reference toeneral boat repairs,11 ' . <br /> � p . ,E 111s indicated that he has nude <br /> repairs to the Sailfish that contained a haze in the bow section. It was <br /> found partially submerged after the storm. A keel guard has been ordered <br /> particular e ed <br /> for this <br /> P ar boat. Dr. Gordon noted that hi s has been an <br /> ongoing problem for theP ast five ears. <br /> All other activities remain on schedule reported i P ed Mr. Ells who noted that <br /> he anticipates to remove his navigational equipment b late October r <br /> earl November. � a �n <br /> Dc&king EBili `es Stats: As a result of the i�� �Rivers Protection Act all <br /> balding perrriits for the new dock facility must be in place by October 5, <br /> 1996 inforrned lair. Ellis who announced the following,,; <br /> . <br /> Cape and Islands Harbormasters Meeting <br /> epte�mber 3, 1996 - 121P ,rn. <br /> P <br /> Nantucket <br /> MA Harbormasters Association Meeting <br /> September 1 , 1996 - 7:00 p.m. <br /> Plymouth <br />
The URL can be used to link to this page
Your browser does not support the video tag.