Laserfiche WebLink
MA S H P E E WATERWAYS COMMISSION+ <br /> MINUTES MAY 7� 19 9 ! <br /> COMMISSIONERS PRESENT; Jim Hanks , Chairman, Ben. Gordon{ Fred <br /> Fordham, Herb Silver, .illi air Taylor, <br /> Also present: Perry Elis , Harbormaster <br /> RiLck York, Shellfish Constable <br /> Eric Smith, Assistant Town Planner <br /> CALL TO ORDER: Mr, Hanks called the meeting to order in the <br /> DPW conference Room at 7 : 06 p.m* <br /> PUBLIC COMMENT: Mr. Smith announced there will be a Coastal <br /> on.in�f Managelaent presentation on Wednesday at Town Hall , and <br /> mads will be rade available showing the shoreline change,, <br /> Mr. Smith plans to attend and will make copies of the mads for <br /> interested Waterways Commissioners , <br /> Eric Smith attended an alternative wastewater treatment systems <br /> seminar. Mr, Hanks skimmed through the materials and will make <br /> copies for anyone .interested <br /> MINUTES: The Minutes of April 4 , 1997 ( submitted by Mar <br /> McDonough) were accepted as amendedt <br /> Dr. Gordon made a motion to limit - Public Comment discussions <br /> of a topic to a maximum of 30 minutes. Mr. Fordham seconded, <br /> Unanimous. <br /> CORRESPONDENCE <br /> There will be a public hearing tonight at 7 : 30 Board of Appeals <br /> Meeting on dock permit applications for Gary Locarno Steve <br /> H nds , and Sainuel Mancuso. <br /> Mr. Hans distributed a copy of his letter to Gregory Penta , <br /> U.S, Arm corps of Engineers , describing the Aubrey flushing <br /> analysis of October 1996 , pertaining to the improvement <br /> flushing imp <br /> � pt <br /> to be expected from several dredging scenarios . Copies were <br /> sent to EPA and Marine Fisheries , <br /> OLID BUSINESS <br /> Harbormaster Re2ortt-. Mr* Ellis reported the maritime skiff <br /> engine was overhauled and the barge was rebuilt. The <br /> Mashpee-Wakehy ramp is now under the Harbormaster ' s 3 urisdictiont <br /> Clifford Security won the bid to provide the gate attendant <br /> at the Mashpee-Wakeby boat ramp. A sign has been requested <br /> in the parking lot noting the speed limit and hours open to <br /> the public. The Town' s liability will be covered with the use <br />