My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/4/1997 WATERWAYS COMMISSION Minutes
>
11/4/1997 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:09:18 PM
Creation date
2/26/2018 12:40:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/04/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Waterways7' roxerent �an ` d �rit r Ha rhowed <br /> some data sheets displaying bathyrtietric data for the dashp� <br /> e , <br /> River that he obtained from Wayne Jaed� �� �'�� sheets are p <br /> ,� fasted . <br /> to jether ,, and three se�finents (A, B, and. C) of aro_ osed <br /> have been drawn �.�.t M � � channel <br /> Mr.. Hanks also picked u bathymetry data <br /> sheets for Ockway Bay, Shoestring Bay and Pop' onesset Bay , but <br /> Bayne plotted these sheets � .. i <br /> using "northings s and eastings instead <br /> of lattitude and longitude , so we cannot easily sly but the whole <br /> eitiba yment together. we will try to catch Wayne in <br /> jobs to provide�.de between �.red�e <br /> more charts . e also want to superimpose the <br /> contour maps on the digitized USGS topographic maps . Eric ' <br /> has done it b� eyeball , which Smith <br /> is hel ful , but there are places <br /> where the contours are on land. this affects the 'credibility <br /> of the picture, <br /> Mr. Hanks is calculating the volumes of iiia <br /> ter ia 1 to be removed <br /> from the Mash ee River segments , and he hopes to et <br /> � � Bayne <br /> Jaedtke to use the Hypack software to more accurately c <br /> the dredge material volur��es a�.cu�.ate <br /> Another problem area is the dis oral of dredged material . <br /> pipe is only5 , 000 feet the <br /> long. As we �o further up the River, <br /> F <br /> we w ' 11 not be able to reach the proposed de--watering site <br /> the Ma.shpee Neck Ramp. B � to at <br /> Because the area i s si-aa 1 l , we will have <br /> to pump the basin full , lot it settle, drain it then <br /> raater-�a�. away and fill. { truck <br /> { the basin again, <br /> n* This could be quite <br /> t Mme consuming and raise the cost of dred i n -* There <br /> let of oderl issues yet t � . �' are a <br /> ' o deal with on disposal <br /> The next steps are to discuss the ritod <br /> elin(4 with Brian, set up <br /> the dredging scenarios , andet Aubrey Consulting <br /> � to run their <br /> hydrodynamic rtiodel to predict the effects of each channel segment <br /> on water quality . <br /> With all the new information a n <br /> d the modeling <br /> results , we should be ready to send a letter to the Arm <br /> of Bn�inee�`s to resume the d Corps <br /> redgi n perrai t process <br /> NEW BUSINESS <br /> Federal No. Discharl4e Area Desi nation- F <br /> Nor. Hanks distributed <br /> a handout listing the application tasks to m �r <br /> make �oponesset <br /> Bay a no discharge area , and he reviewed the <br /> allocation of those <br /> tasks. Since two towns are involved with Poa��_- on <br /> sesset Bays <br /> Mr. Hanks provided den <br /> Molloy of Cotuit with a copy of the <br /> Chatham ad d,i ca.t.i on and a copy of the task descriptions <br /> so he <br /> can initiate their ,dart of the process <br /> Mr, Hanks , Paul Lumsdun, and Bill Taylor w' <br /> x.1.1 work as a sub <br /> cormni t tee on this task. Mr. Hanks gave Mr. Lumsden a cody <br /> of <br /> Chatham ' s completed application to review, <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.