My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/04/2000 WATERWAYS COMMISSION Minutes
>
04/04/2000 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:21:09 PM
Creation date
2/26/2018 1:34:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/04/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOWN <br /> Town of Alashpee <br /> :n <br /> • 441 16 Great Xeck load Xorth <br /> A_ Alaslipee, Massachusetts 02649 <br /> .s <br /> Mz 4 SffPEE Wz 4 T rR W?4)IS C OMMISSle 2A <br /> 4 <br /> s <br /> 2000 <br /> Attendance: .dim Hanks,, Gerald Daly, William Taylor, Donald Lund, and Secretary, <br /> Jennifer Ahearn. <br /> Other Attendees: Ed Baker,, Per Ellis, Leslie Fields, and John Swartzbaugh. <br /> LL To ORDER <br /> hairman Jim Hanks called the meeting to order at 7;10 p, , <br /> 1. Public Comment - Mr. Hanks recognized FIs. Leslie Fields from the WoodHoly <br /> Group. FIs. Fields addressed the commission regarding the completed draft report for <br /> disposal options for the Mashpee River Dredging Project. <br /> Leslie distributed to all commission members a draft report detailing the construction <br /> costs of the various options previously discussed concerning dredging and disposal. <br /> There are six options that are preferred and five secondary, less desirable choices. <br /> Ms. Fields led the commission in a discussion of the draft report. The discussion focused <br /> on the lower cost options and then led to the higher cost options. <br /> Also included in his. Fields handout material was an Analysis of Environmental Impacts <br /> and an Analysis of Construction Costs. These analyses were very helpful to the <br /> commissions' discussion comparing and ranking the preferred options with the less <br /> desirable options. <br /> The commissions" discussion ultimately focused on A-2, which is Hydraulic Dredging to <br /> Stenberg Parcel, Truck Sediments Off-Site,, Restore Site at a cost of$2007950. <br /> Also discussed was B- , which is Hydraulic Dredging to Ockway Bay Public Landing, <br /> Truck Sediments Off-Site at a.cost of$33 1�100. <br />
The URL can be used to link to this page
Your browser does not support the video tag.