Laserfiche WebLink
October 1997 <br /> Page 11. <br /> CONTINUED TO 23 OCTOBER 1997 AT :30 P.M, <br /> 9:15 MAS P E MARKETPLACE NOMINEE TRUST for site <br /> landscaping and buffer zone enhancement for a proposed commercial facility <br /> at 68 & 74 Algonquin Ave., and 409, 402 and 429 Nathan EHighway. <br /> Michael trot ke asked for a continuance. <br /> Public comment: Dino Mitrokostas, an abutter, was present to view the plans. <br /> He made no comment. <br /> VOTE: Motion made and seconded to continue to 6 November 1997 at the <br /> request of the applicant. 1, nani no s Vote. <br /> HEARING CONTIN D TO 6 NO OMI 1997 AT 7:30 P.M. <br /> 9:25 BERNARD LAS ITT for construction of a dwelfing with associated <br /> landscaping and septic system at 17 Wheelhouse Lane. Michael Grot ke <br /> presented abutter notification receipts. <br /> Mr. Sherman stated there was the issue of the cover page which was sent by <br /> certified nail. Harold Cohen was lasted as the legal owner. It is a land-locked <br /> lot. It is in the flood plain. Issues under the Bylaw have been addressed. <br /> Mr. Grotke stated it has been reduced to a three bedroom house with a Fast <br /> system and asked for approval tonight. <br /> Public comment: none. <br /> 'COTE: Motion Ornade and seconded to close the hearing pending receipt of <br /> DEP number and comments. Unanimous Vote. ' <br /> CLOSED PENDING. <br /> 9:35 MASSACHUSETTS CHAPTER THE NATURE <br /> CONSERVANCY for a Determination of Applicability on a request to install <br /> stilling wells and piezometers for ground and surface water measurement in <br /> the Mashpee Pine barrens off Great lay Road. Richard McCorney <br /> presenting. <br /> Mr. Sherman stated the alteration is minimal. <br /> Asked if this would be subject to vandals, Mr. McCorney stated it is a remote <br />