My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/22/1998 CONSERVATION COMMISSION Minutes
>
1/22/1998 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:04:58 PM
Creation date
2/26/2018 2:18:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/22/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22 January 1998 <br /> Page 1 . <br /> Mr. Shaw asked if there is nothing on the pond side? <br /> Mr. Sherman stated no, for expense purposes. From the standpoint of the <br /> environment, it meets the standards. <br /> Mr. Sha.w stated it should be both sides for safety purposes. <br /> The Chairman advised the Building ding Inspector stated to put up the fence, post <br /> it, and the Town would be covered for liability. Extra effort would have to be <br /> taken to get to the other side and if posted the Town is covered. <br /> Pubhe comment: none. <br /> VOTE: Motion made and seconded to find negative. Unanimous Vote. <br /> NEGATIVE DETERMINATION, <br /> Tree Cutting: The Agent advised he was told by the Commission that 'Porn <br /> Starruch could proceed with the tree cutting work n Shields Road <br /> Conservation land as authored by the Commission. The cost will b $250. <br /> He asked permission to toll him to go ahead. <br /> VOTE: Motion made and seconded to proceed. Unanimous vote. <br /> t bio work: Trout Unlimited is sending volunteers to help at the Museum <br /> on February 7th at :00 a.m. Mr. Sherman stated he is hoping for volunteers <br /> from the public and Commission also. This is weather depending. <br /> Maushop Revetment: Mr. Sherman advised they discovered after the <br /> revetment was built that they had to comply with the Cape Cod Comniissiorr s <br /> permit, which is to set up an escrow account for beach nourishment before <br /> they started the work and they had not done that. They were under an <br /> enforcement situation with the Cape Cod. Commission wi <br />
The URL can be used to link to this page
Your browser does not support the video tag.