Laserfiche WebLink
19 March 1998 <br /> Rage . <br /> GARY LOCARN , 51 Waterline Drive south, a request to amend <br /> continued from 22 January 1398. Michael Grotzke presenting. <br /> Mr. Sherman stated the same plan is before the Commission as Board of <br /> Appeals. This can be closed pending. <br /> 1&. Grotzke stated the footprint was approved two years ago. There is a <br /> portion encroaching on the street setback. <br /> Public comment: nine. <br /> VOTE: Motion made and seconded to close pending Board.of Appeals <br /> approval. Unanimous vote. <br /> CLOSED PENDING. <br /> :50 LIPI DSKY FAMILY TRUST to construct a dwelling, garage, deck, <br /> driveway, leaching catch basin, water service, subsurface sewage disposal <br /> system and utility service at 123 James Circle. Dave Sanicki presenting. <br /> Abutter notification receipts provided. The 50 foot buffer will rernahx <br /> undisturbed. An asphalt driveway is proposed with catch basin. <br /> Mr. Sherman stated the work Emit is tight but will have to be adhered to. <br /> The applicant should be aware there is a ,pending enforcement order. .A <br /> decision will have to be made re compensatory planting. Staking will be <br /> verified. <br /> Public comment: None. <br /> VOTE: Motion made and seconded to close pending receipt of DEP number, <br /> verification of the flagging and staking, condition imposed on the <br /> removal of slash, and a compensatory planting plan required at <br /> the discretion of the Commission. Unanimous vote. <br /> CLOSED PENDING. <br /> Michael Forde, President of Johns Pond Assoc., arrived late for the hearing <br /> and expressed concern for getting in and out of this property. He was told he <br /> could submit comments in writing. <br /> 8:00 DEBRA ANASTOS, MARJORIE CLAPPROOD AND SUSAN <br /> WO RNI CK to pump and fill an e)dstin g cesspool and installation of septic <br /> J <br />