Laserfiche WebLink
19 March 1998 <br /> Page 7. <br /> Mr. Sherman asked if top of bank is shown and was told it is located on the <br /> plan. He stated the work Rmit is a distance of 2 ' away from the house and <br /> asked why? He asked where the wetland line is located? Normally, a flagged <br /> wetland hne :Ls Line: required on the plan with numbered flags. Once received, he <br /> will verb. He suggested bringing the work limit up to the cart path. <br /> The abutter asked, the easement, does it follow that line that is there? Aft. <br /> Green stated it is 1 ' to each side. <br /> Mr. Sherman stated the well area will have to be revegetated after <br /> disturbance. <br /> .Abutter receipts were provided; white receipts to he nailed. <br /> VT : Motion made and seconded to close pending receipt of DEP <br /> number, revised plan with work hmit moved and wetland <br /> flagging confirmed by the Agent. Unanimous Vote. <br /> CLOSED PENDING. <br /> 8:40 JASON STONE, 47 Great Oak Toad, continued from 4December 1997. <br /> Norman Hayes presenting. He stated he would he requesting continuances on <br /> all gree hugs if the Commission does not have Town Counsel's opin'on on <br /> the issue at hand as to whether the subdivision predates zoning regulations. <br /> N[r. Sherman stated., additionally, there are hack taxes due. Town Counsel's <br /> opinion is expected prior to next meeting. <br /> It was noted Atty. Fain Gildea would like a copy of the position paper. <br /> Pubhc comments: none. <br /> VOTE: Motion made and seconded to continue the hearing to 2 April 1998 <br /> t the request of the applicant. Unanimous Vote. <br /> HEARING CONTINUE TO 2 APRIL 1995 AT 3:20 PbM* <br /> 8:50 STONE/MC ELROY, 49 Great Oak Road, continued from 4 December <br /> 1997. Dornan Hayes presenting. <br /> Public comments: none. <br />