My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/2/1998 CONSERVATION COMMISSION Minutes
>
4/2/1998 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:19:45 PM
Creation date
2/26/2018 2:27:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/02/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 April 1998 <br /> Page 17. <br /> It is o' from the high speed channel, UT ` 'ties will be trenched in the <br /> pathway, The Board of Appeals hewing is set for 26 May. They have the <br /> Army Corps ofEngineers permit. <br /> Mr. Sherman stated the attestation of ownership is missing. The depth of <br /> the propulsion unit will be restricted. <br /> Rick York stated it is not a problem for shellfish. <br /> Public comments: None. <br /> VOTE* Motion made and seconded to close the hearing pending Board of <br /> Appeals action. Unnixnous Vote. <br /> CLOSED PENDING, <br /> :10 BERT MC CONNELL for construction of a walkover structure and <br /> pier with 8" diameter wood piles over a coastal bank, salt marsh, and <br /> intertidal and subtidal areas in Ockway Bay. The project includes an 11' x <br /> 18' float with attached gangway and utility service to the pier via a 8" x 2- <br /> Y2' trench through the buffer zone to the coastal bank. Norman Hayes <br /> presenting. The dock is 110"; there is a 50' span of salt marsh. The water <br /> depth is 2.2'. A special permit is required. The structure will be ' above the <br /> salt marsh for publi <br />
The URL can be used to link to this page
Your browser does not support the video tag.