My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/2/1998 CONSERVATION COMMISSION Minutes
>
4/2/1998 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:19:45 PM
Creation date
2/26/2018 2:27:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/02/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 App 1998 <br /> Rage 6. <br /> Mr. DiGregorio advised the well casing is 95' from the closest wetland flag of <br /> the dog and in the 100' buffer of the vernal pool and quaking dog. A chain <br /> link fence will be installed around the well casing. With the well installation <br /> there was a clearing of about 3000 s.f. of buffer zone for the turnaround off <br /> Turner Road. An enforcement letter was issued for planting. There is a <br /> series of four lines of haybales for run-off that has been doing a good ,fob. A <br /> truer wiH be installed in the pump house. The well will pump a maxum of <br /> 576,000 of water per day. si <br />
The URL can be used to link to this page
Your browser does not support the video tag.