Laserfiche WebLink
July 1998 <br /> Page 7. <br /> Mr, Sherman asked which plans are now part of the amended order. Three <br /> plans were provided. <br /> Mr. Landers Cauley advised the applicant would be flexible on the ground <br /> cover. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to close pending update of the plans. <br /> Unanimous Vote. <br /> CLOSED PEEING. <br /> 8:10 POPPONESSET BEACH ASSOCUTION, continued from 25 June <br /> 1938. Mr. Deschino stated it was continued for shoreline bird issues. <br /> Mr. Sherman stated lune Boretos spore to Mass. Audubon. An Order of <br /> Conditions has been drafted. l aintenance in perpetuity will not be given. <br /> Public comment; none. <br /> VOTE: Motion made and seconded to chose pending receipt of DEP number. <br /> Un ani nous Vote. <br /> CLOSED PENDING, <br /> :20 GREGORY HUNT 15 Harbor Ridge Drive, continued from 11 June <br /> 1938. Norman Hayes presenting. At the last meeting information was <br /> requested regarding construction methodology and storage or materials. <br /> ALOE and IMF required widths be reduced to '. Size was reduced from 1 <br /> x 11 to 18 x 9. flans will be initialed with the changes to avoid extraordinary <br /> fees for the clients. <br /> Mr. Sherman asked how they will get the material down there? Mr. Hayes <br /> advised the dock will be built upon completion of the house. If necessary, it <br /> will be built off the locus and brought in. <br /> Mr. Hayes stated for Ockway Bay Trust, constructi <br />