Laserfiche WebLink
August 1998 <br /> 'age 14. <br /> The Chair stated this report then states for the purposes of improving the <br /> condo n of the Mas pee River, there is no paint. The 'waterways Committee <br /> will probably say they need this for navigation in order to am' tproperty <br /> values. Mr. Sherman stated there is some need for doing it for navigation <br /> purposes in some peoples minds. <br /> Mr. Wirsen stated the people who won the landfffl bid will meed X amount of <br /> yards and it is more than 40,000 c.y. and they may be wiffing to pay for the <br /> trucking. <br /> J. Braden Thompson Plume: The Agent advised this is the plume NE of <br /> Snake Pond. The State will be starting in the fakl to set up treatment <br /> systems. It may not come under our jurisdiction. Some readings were <br /> the Hundred parts per b' ' n. There is information in the hbrary, <br /> CCC-Mashpee Commons: A meeting will be held at Town HaU on 1 <br /> September, Thursday, at :00 p.m. The Public hean*ng is at :30 p.m. <br /> Stone/McElroy: The Agent advised these lots are back before Board of <br /> Appeals next week. They are looking for a 35' setback-from the wetland. <br /> Mr. Rosenberg advised they want to move the house to within 2 ' of the road; <br /> they want to move 3 ' from the edge of the wetland; and they want relief <br /> from. the ACEC provision. There will be a letter from the Associations of <br /> little Neck Bay and South Cape Civic Association, all against. <br /> Southport: Because of the volume of business, the Agent has not been able <br /> to get out there. <br /> Conservation est tl : The property is on Old Barnstable Road. The <br /> correct plan has been receivedgiving the 20'. This willbe recorded. 11!x. <br /> Rosenberg asked for tine on the next agenda to discuss proposed ideas. <br /> E Q ashnet: There is a new person in charge, Nancy Bal ups. She may <br /> come before the Commission on September 3. <br /> Cohen: Project previously approved with dem"trifying system. They do not <br /> want to do this now and they are not required to do so as they are not <br /> increasing bedrooms. <br /> Mashpee River Remediation: Extension permit signed. <br />