My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/1998 CONSERVATION COMMISSION Minutes
>
11/12/1998 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:08:26 PM
Creation date
2/26/2018 2:38:08 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/12/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12 November 1998 <br /> Pace 8. <br /> NEGATWE DETERMINATION, <br /> 7:15 NEW SEABURY ES, C, Popponesset Inn <br /> continued froom, i October 1998. Michael Grotzke presenting. <br /> I . Sherman staffed he spent time withflood maps and the rendering <br /> Mr. Grote's flood pane. It iclose footprint of the building. <br /> Mr. Grote stated it is not aja exact science. He illustrated how he cavae to <br /> his ding. -Ilevel of confidence � ` <br /> that this is within a few Feet. <br /> The whole flood zone concept is not to <br /> precise. <br /> Mr. Sherman suggested the Comrmssion <br /> spud be careful with this one. <br /> aged fir. Grote to provide the nethe odo�og� � will run this by FEMA <br /> and CZM to see if they e . <br /> Mr. Grote asked how this was relevant? <br /> M . Sherman advised <br /> Rebecca Haney agrees this is relevant. If <br /> the V-zone <br /> touched that building, it would probably be in i. <br /> advisable to make a solid <br /> building there. It is crucial where the V- <br /> _ one is. He asked Mr. Grote to <br /> write up his methodology to be submitted to A/1and CZM. If they agree <br /> this is a'reasonable approach the Comrmssion will accept i . <br /> Mr. Fitzsunmons asked what will be <br /> one with the concrete r. e <br /> going to add structure. Mr.. � are <br /> Arte stated the proposed structure and <br /> the <br /> existg structure fa under the sane elanbuildings�cat�.on under tie code <br /> s membrane structures. <br /> Mr. Sherman stated e has not had . <br /> . opportunity to discuss �t the <br /> Building Inspector. <br /> 1 r. Got e displayed photographs. • <br /> The tent hasertcal posts; the <br /> Proposed structure <br /> has a rigid steel ftame. X r yyy is <br /> vertical Evan. Mr. Grotzke stated the only vertical is <br /> a wave hit it, it would just blow the canvas right wed what material <br /> is the roof, he stated it is canvas. <br /> A/Ir. Fitzsimmons stated if this is to be continued, e would hke to have •�t <br /> brought to a conclusion next time. Mr. Gr <br /> ote aisd because of the i <br /> time <br /> frame for ordering, the need to make <br /> � a commitment now. <br />
The URL can be used to link to this page
Your browser does not support the video tag.