My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/1998 CONSERVATION COMMISSION Minutes
>
12/17/1998 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 5:10:31 PM
Creation date
2/26/2018 2:39:11 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17 December 1995 <br /> 'age 4. <br /> use this as a pilot test. This EW5 may or may not capture the whole <br /> plume <br /> so they may still have to beep this on to capture what is over here. The EW5 <br /> well, the basically the center line of the plume is here and this was chosen t <br /> be th'e center of the K1 bog and they are hoping to cut it of effectively and i <br /> is possible this may go away with time. what they have to look at is the <br /> time <br /> to travel. If the groundwater moves a foot a day, it would take severalear <br /> y s <br /> for this to flush itself out. As a minimum,' this shallowoundwa <br /> gr to system <br /> would likely have to operate five years. This represents the first step <br /> of <br /> trying to remediate the plume. with their surface water sampling, they have <br /> seen very consistent levels of I ppb in the surface water at this location. <br /> Because the amount of water that is flowing down here that equates t <br /> about <br /> .04 when it gets down here because there is so much water moving through <br /> o h <br /> the system. They are trying to protect human health and at the s - <br /> �e time <br /> try to see how effective they are with the system they havebycallln the <br /> a <br /> pilot test. <br /> Mr. Green asked if the Commission has a copy of the treatment plant plans: <br /> Mr. Sherman advised they will be ung a complete package within the <br /> newt <br /> few clays, <br /> Mr. S ymoniak stated the system they are going to construct is ver sib <br /> � ar <br /> to what they have at the Coonamesset bogs. <br /> The Chair stated this has been very interesting and will <br /> help the <br /> Commission to be ready for the NOI presentation. He thanked <br /> Mr. <br /> S ymor ak. <br /> 7:10 RICHARD SPOON to construct and maintain ' widewa at with <br /> p y <br /> landscape tie steps and ramp and ' x 16' float at 1d ewate o <br /> g - ad. Mr. <br /> Spohn was present. John Johansen stepped down for this hearing s . e <br /> assisted with the Notice of Intent ming. <br /> Mr. Sherman advised he reviewed the site the other day and with putting i <br /> tiered steps, no BVW.will be lost. It can be conditioned to have neghgible <br /> impact. Little River Boatyard carne up with the plan. This will be goin <br /> before Board of Appeals next month. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to close the h arm pending receipt <br /> p <br /> of Board of Appeals Decision. Unanimous Vote. <br />
The URL can be used to link to this page
Your browser does not support the video tag.